The part drawing says automatic degating. On the shop floor, an operator is still holding a trimming knife because the gate did not break cleanly. That gap between the specification and the actual result is exactly where tunnel gate design matters.
Tunnel gate injection molding is a practical way to keep a two-plate mold simple while eliminating secondary gate trimming. But it works only when the gate geometry, material behavior, ejection force, and cooling conditions are aligned. In the following sections, we explain the tunnel gate structure, material limits, common defects, and the points that buyers and engineers should check before ordering a tunnel gate mold.

What Is a Tunnel Gate and How Does It Work?
A tunnel gate, also called a submarine gate, is a gate that feeds melt into the cavity from below the parting line. The gate is a short angled channel machined into the mold steel, connecting the runner to the cavity wall. Because the gate is below the surface, the gate mark appears on a side wall or an internal, non-cosmetic surface of the part.
Tunnel gate injection molding works on a simple principle: the gate is a controlled weak point between the runner and the cavity. During injection, melt travels along the runner, enters the submerged channel, and rises into the cavity through the gate. After packing and cooling, the mold opens and the ejector system pushes the part off the core. The runner is held at the same time, so the narrow frozen gate shears off automatically. This is why tunnel gating is specified when automatic degating is required.
- The gate is located below the parting line, usually on the core side of the mold.
- Degating is driven by the ejector stroke; no operator trimming is needed for most conventional thermoplastics.
- The gate mark is small and can be positioned on a hidden surface.
- The part and the runner are stripped in the same two-plate mold cycle; the relative movement between them breaks the gate.
- For the break to be clean, the material must be rigid enough at ejection to shear, but not so brittle that it cracks.
Tunnel Gate Mold Structure and Key Dimensions
The tunnel gate is machined directly into the mold steel. Because the channel has an angled geometry, it is normally produced by EDM. In production molds, the gate is often placed in a replaceable insert. That makes it easier to service the gate when wear changes its diameter, without welding or re-cutting the main cavity.
The gate shape is defined by three values: diameter, angle, and land length.
For most unfilled engineering plastics, a gate diameter of 0.8 to 1.5 mm is a typical working range. Larger parts and glass-fiber-reinforced compounds usually need a gate at the upper end of that range, while small thin-wall components can use a gate below 1.0 mm. The gate diameter should always be checked against the melt flow of the selected grade.
The gate angle is commonly set at 30 to 45 degrees relative to the parting line. A shallower angle reduces the ejection force needed to break the gate but leaves a wider mark. A steeper angle shears more cleanly, but the ejection system must apply more force. The final choice depends on the part geometry and the available ejector stroke.

The land length, which is the distance between the runner and the cavity wall, should be as short as possible. In a well-designed tunnel gate, the land is usually between 0.5 and 1.0 mm. An excessively long land increases pressure loss and can create a hesitation mark during packing.
One more element belongs to the same design area: the cold slug well. The melt left in the nozzle tip during the previous cycle is colder than the melt that follows. If that colder plug reaches a narrow tunnel gate, it can block the channel or create a weak spot on the part. The runner must end in a cold slug well, typically the same diameter as the runner or slightly larger.
In many tunnel gate molds, the runner is cut in the moving half, and the gate enters the cavity from the core side. This arrangement helps the part stay on the core during ejection, which is necessary for the gate to break. If the part releases from the core too early, the ejection system cannot create the relative motion that breaks the gate. This detail should be verified during the mold design review, not after the first trial.
Material Selection Limits for Tunnel Gating
Material selection is not a separate decision from tunnel gate design; it determines whether the gate can shear off cleanly at ejection. The easiest materials for tunnel gating are PP, PE, ABS, and HIPS. They produce a consistent break and a small, controlled gate mark. POM works well, particularly with a moderate gate size. Unfilled or lightly filled PA6 and PA66 are also acceptable.
Materials that require caution should be reviewed in the DFM stage, not after the mold is cut.
- PMMA, PS, and SAN are brittle. If the gate is too large or the ejection speed is too high, the gate area can tear or micro-cracks can appear near the break point.
- TPU and other soft elastomers tend to stretch. Instead of a clean shearing action, the gate leaves a string or a sticky tail, especially if the material is highly elastic at room temperature.
- Glass-fiber-reinforced compounds erode the gate edge. Gate diameter gradually increases, which makes the gate mark larger over time. Hardened gate inserts should be specified for long production runs.
A practical rule: ask for the melt flow rate of the selected grade before fixing the gate diameter. A high-viscosity grade and a low-viscosity grade will not behave the same through the same tunnel gate. The first shot after every machine shutdown should also be watched carefully, because solidified material in the nozzle can briefly block the tunnel gate.
Tunnel Gate vs. Other Gate Types
Choosing a gate type is a decision between part appearance, cycle time, tooling cost, and maintenance. The table below organizes those trade-offs in terms of day-to-day production.
| Gate type | Degating | Part appearance | Mold cost | Typical use | Maintenance |
|---|---|---|---|---|---|
| Tunnel gate (submarine) | Automatic during ejection | Small mark on side or hidden surface | Higher than edge gate | High-volume parts, automatic two-plate molds | Moderate; gate wear in filled compounds |
| Edge gate (side gate) | Manual trimming or semi-automatic | Mark on the parting-line edge, normally trimmed | Low | Prototypes, low-volume parts, simple molds | Low |
| Pin-point gate | Automatic in three-plate mold | Small circular mark | Similar to tunnel gate | Medium-size parts, automatic runner separation | Low to moderate |
| Hot runner gate | No runner to eject | Small mark at the nozzle tip | High | High-volume parts, high-priced materials, fully automated cells | High; heaters and tips require regular checks |
Compared with an edge gate, the tunnel gate adds mold construction cost but removes manual trimming from the production cycle. Compared with a hot runner, the tunnel gate is significantly less expensive, although it still produces a runner that must be recycled or disposed of.
Common Defects and Quality Risks in Tunnel Gate Molding
When a tunnel gate performs poorly, the root cause is usually one of the following three situations. Identifying the cause correctly prevents unnecessary mold rework.
- Raised or stringy gate vestige. A small remnant after the break is normal, but a raised or stringy vestige means the gate was not fully frozen before ejection. The adjustment path is to increase cooling time, slow the initial ejection speed, or reduce the gate diameter.
- Torn or cracked gate area. Brittle materials can pull out around the gate, leaving a rough depression or a small crack. This is a material behavior problem. The practical solution is a smaller gate cross-section or a slower ejection break.
- Enlarged gate mark in glass-fiber molding. The abrasive compound erodes the gate edge over time, and the gate opening grows. The part shows a larger witness mark, and the pressure curve changes. A replaceable gate insert should be inspected during scheduled mold maintenance.
For quality control, the first article inspection should measure the gate vestige height against a signed boundary sample. Checking by eye is not enough when the part goes to an assembly line that is sensitive to raised material.
What to Check When Sourcing a Tunnel Gate Mold
From a purchasing and project management perspective, a tunnel gate mold does not require special machinery, but it does require a mold shop that treats gate geometry as an engineering detail. The following points should be confirmed before the tooling order is placed.
- The part drawing indicates the exact gate location and the acceptable witness mark.
- The mold drawing states the gate diameter, angle, and land length, not just a default note.
- The gate insert is replaceable for high-volume molds, especially with abrasive materials.
- The runner design includes a cold slug well at the far end of the runner, past the last gate.
- The part has enough grip on the ejector side for the gate to break during ejection.
The cost difference between a tunnel gate mold and a comparable edge gate mold is not small, but it is normally recovered when production volume is high enough to benefit from automatic degating. For short production runs, an edge gate with manual trimming may be a better financial choice. If the material price is very high, a hot runner should be considered even though the mold cost is higher.
When Not to Use a Tunnel Gate
There are cases where tunnel gating is not the right answer, even if the mold design looks acceptable at the quotation stage.
- Parts with zero gate marks on visible surfaces.
- Brittle materials that crack at the gate during molding trials.
- Soft materials that stretch instead of shearing.
- Very short production runs where manual degating is cheaper than the added tooling cost.
- Parts that do not have a reliable grip on the ejection-side core.
In those situations, the gate type should be driven by the material behavior and the production plan, not by an assumption that automatic degating is always better.
A tunnel gate works when it is treated as part of the whole molding system: material, mold, machine, and ejection process must all support the same result. That means the gate geometry should be approved in the DFM review, verified in the first trial, and checked again after long production runs. When those steps are done, the shop floor result matches what the drawing promised.
Recent Comments (0) 0
Leave a Reply