The Most Common Misconception About Gas Burn
When a molded part shows black streaks or dark spots, many teams first reduce barrel temperature. That action is logical but often incomplete. Gas burn in injection molding is frequently not a sign that the entire melt is overheated. It is more commonly the result of trapped air or gas being compressed rapidly inside the cavity. The pressure increase drives local temperature high enough to degrade the polymer or ignite volatile gases at the cavity surface.

From a manufacturing perspective, this distinction matters. A barrel temperature change may hide the defect on one mold trial but create other problems such as short shots, higher pressure drop, or poor surface replication. The more reliable path is to identify where gas is trapped, how the flow front is moving, and whether the venting system can release that gas before compression.
What Gas Burn Actually Means in Injection Molding
Gas burn, sometimes called gas mark, burn mark, or diesel effect, is a surface defect that appears as black or brown streaks, dark spots, gray smudges, or colored halos on a molded part. It is usually located at the end of fill, around ribs, bosses, weld lines, sharp corners, or areas where two flow fronts meet. The mark is not always an open flame burn. It is typically localized thermal degradation of resin, additives, or volatiles left on the cavity surface.
The gas source can be cavity air, moisture vapor, volatile components from the polymer or masterbatch, decomposition products from an overheated hot runner, or lubricants and mold release residues. During filling, these gases cannot escape quickly enough. They are compressed between the advancing melt front and the cavity wall. Under rapid compression, gas temperature rises sharply. The resulting diesel effect damages the polymer surface and leaves the defect that buyers and quality teams reject.
How the Defect Forms: The Fill Stage That Gets Skipped
Gas burn is best understood through the filling sequence. The screw injects melt into the cavity. The melt front pushes air forward. If the mold is vented correctly, air flows through parting line vents, ejector pin clearances, or dedicated vent channels. If the vent path is insufficient or placed incorrectly, the air pocket remains in front of the melt.
As the cavity fills, the remaining gas volume becomes smaller while the melt continues to advance. Injection pressure can compress that gas from roughly atmospheric pressure to several hundred bar in a very short time. The rapid pressure increase creates high local gas temperature. When the melt front finally reaches the trapped gas region, the hot gas and the polymer surface interact, causing visible degradation. This is why gas burn often appears at the last area to fill, not at the gate.

Primary Causes of Gas Burn Defects
Root cause analysis should separate process variables, tooling conditions, and material handling. In production, the defect is rarely caused by only one factor.
Insufficient venting or blocked vent channels at the parting line, ejector pins, or core pins
Process Parameters: Check These Before Tooling Changes
When gas burn appears during sampling, process adjustment is usually faster than mold modification. The first step is to map the flow front with a short shot series. That shows the last-filled areas and confirms whether the burn mark matches an air trap location.
Injection speed profiling is the most practical process correction. Reduce speed at the end of fill rather than slowing the entire shot. This gives trapped gas more time to escape through existing vents without causing a short shot or unacceptable cycle time. The velocity-to-pressure switchover point should also be reviewed. Switching too late can force melt into the air pocket at high speed.
Other parameters to verify include back pressure, decompression, melt temperature, and barrel residence time. Low back pressure may allow gas to enter the melt stream. Excessive decompression can pull air into the nozzle during screw recovery. High melt temperature is relevant, but it should be evaluated together with venting, not as the only cause.
Tooling and Venting: The Higher-Value Fix
If process changes reduce the defect but cannot eliminate it, the next step is venting. A mold that works at a slow fill speed may fail when the same part is run at a normal production rate. That usually indicates marginal venting, not a fundamentally unprocessable part.
Vent depth must be matched to the material. It must allow air to escape without creating flash. As a general engineering reference, semi-crystalline materials such as PP or PE may allow shallower vent depths than some amorphous materials, but exact values depend on viscosity, part geometry, and clamp force. For typical injection molding applications, many mold makers use vent depths in the range of 0.02 mm to 0.05 mm at the parting line. The depth should be confirmed with the mold maker and polymer supplier for the specific grade.
For blind pockets, deep ribs, or bosses, parting line venting may be insufficient. In those cases, the tooling should include vent paths through ejector pins, core pins, inserts, or gas pins. Vacuum venting can be considered when the trapped gas is severe or when surface appearance requirements do not allow visible marks. The key is that the gas must have a defined path out of the cavity before the melt front seals that path.
Material and Handling Factors
Some gas burn problems come from the resin rather than the mold. Moisture-sensitive materials generate steam and volatile gases if they are not dried correctly. Nylon, PC, PBT, PET, and TPU are common examples. The drying temperature, drying time, and dew point of the drying system should match the resin supplier’s recommendation. A moisture analyzer alone may not be enough if the drying hopper has unstable airflow or the material is left in an open container after drying.
Regrind is another practical source of gas burn. High regrind ratios can increase dust, shorten thermal stability, and introduce contamination. Additives such as flame retardants, color concentrates, or lubricants can also degrade at high temperature and generate gas. A useful production judgment is to compare gas burn frequency with drying time and regrind ratio. If the defect appears shortly after material changes or worsens with higher regrind content, the investigation should move toward material handling rather than mold venting.
Practical Troubleshooting Sequence
The table below shows how we structure gas burn diagnosis in production. The goal is to match the visible defect location with the most likely failure mode before changing multiple parameters at once.
| Observation | Most likely cause | First verification | Typical correction |
|---|---|---|---|
| Black mark at end of fill or in a thin section | Trapped cavity air | Short shot study of last-filled area | Reduce end-of-fill injection speed; add vent at the last-filled location |
| Burn mark near the gate or hot runner drop | Local material degradation in hot runner or gate area | Check hot runner temperature and gate freeze | Lower hot runner setpoint; clean or inspect gate geometry |
| Dark mark at a rib, boss, or blind pocket | No vent path from blind geometry | Inspect venting through pins or inserts | Add ejector pin or core pin vent; consider vacuum venting |
| Intermittent burn mark after material lot change | Moisture or volatile content | Review drying records and dew point | Dry material to supplier specification; control regrind ratio |
| Burn mark increases after many production shots | Blocked or worn vents | Clean vents and measure vent depth | Establish preventive vent cleaning and depth inspection |
DFM and Supplier Review: Catching Gas Burn Before Tooling
At HYNEU, gas burn is evaluated during DFM review, not only after first-shot inspection. When a drawing or 3D model arrives, our engineering team looks at wall thickness transitions, rib depth, boss design, gate location, and the expected fill pattern. If a blind rib or deep boss has no planned vent path, the gas burn risk is designed into the part. Changing process parameters later can help, but it cannot fully replace proper tooling design.
For OEM and ODM projects, a better discussion is to review the mold filling simulation or, at minimum, a short shot progression during the first mold trial. Buyers should ask where the last-filled areas are, how vents are placed, and how vent depth will be maintained over the production run. This is more useful than asking for a generic guarantee that there will be no gas mark. Gas burn is a process and tooling outcome, not a fixed property of the resin.
Preventing Gas Burn in Long-Run Production
For repeat production, gas burn control belongs in the quality and maintenance plan. A mold that starts clean will gradually lose vent function through resin deposits, grease migration, or polishing activities that reduce vent depth. The best prevention is a short checklist before and during production:
Perform short shot studies for each new mold and after any gate or wall stock change.
Recent Comments (0) 0
Leave a Reply