Chromate conversion coating, also called chromate coating, chemical film, or aluminum conversion coating, is a thin conversion layer formed when aluminum reacts with an acidic chromium-based bath. The layer is measured in fractions of a micron, typically 0.05 to 1.0 micron, so it does not change part dimensions in any meaningful way. What it does change is surface chemistry: it passivates bare aluminum, gives paint and adhesive a stable base, and keeps contact resistance low enough for grounding and EMI housings.
In production, the result is decided by three variables. They are not equally important, and treating them as equal is where most projects run into trouble.

- Surface preparation before the bath. Cleaning, deoxidizing, and desmutting decide whether the coating can form at all. This is the highest-priority variable, because no amount of bath control can recover a contaminated or improperly etched surface.
- Bath chemistry, temperature, and immersion time. These decide coating weight, color, and corrosion performance. They rank second because a well-prepared surface tolerates moderate bath drift, while a poorly prepared surface fails even in a perfect bath.
- Rinsing, drying, and handling after coating. These decide whether the coating survives transport and assembly. They rank third only because they are the cheapest and fastest to correct once the first two are under control.
The sections below follow that order and give the ranges, checkpoints, and reject criteria that are useful on a production floor and in a supplier audit.
Variable One: Surface Preparation Before the Bath
Aluminum arrives at the coating line with rolling oil, machining coolant, mold release residue, oxide, and sometimes silicone from air lines or packaging. The conversion reaction only works on clean, active aluminum. Everything upstream of the bath is therefore about exposing a uniform, freshly activated surface.
Cleaning
Alkaline cleaning is the normal first step for general hardware and machined components. Typical conditions are 45 to 60 °C, 3 to 8 minutes, with mild agitation or ultrasonic assist for parts with blind holes and recesses. The common failure here is under-cleaning rather than over-cleaning: coolant residues that look invisible on a machined surface will produce bare spots and craters because the bath cannot wet the surface uniformly.
Watch for silicone contamination specifically. A small amount of release agent or lubricant aerosol carried into the line produces circular dewetting marks that appear only after coating. Once silicone is in a cleaning tank, it can take a full dump and refill to remove.
Deoxidizing and Desmutting
After rinsing, the part goes into a deoxidizing bath, usually a nitric or nitric-sulfuric based product, sometimes with a chromate-free or chromated formulation depending on the specification. This step removes the existing oxide and, on copper-bearing alloys, the smut left after etching. A properly deoxidized surface is water-break free and has a light, even etch.

Etch depth is a trade-off. A light etch gives a smoother appearance; a heavier etch improves coating uniformity on cast or heavily worked surfaces but starts to affect surface finish and edge radii on precision parts. For parts with tight cosmetic requirements, agree the etch level with the coater before the first production lot, not after.
The Water Break Test
The single most useful field check is the water break test between the final rinse and the coating bath. Water should drain as a continuous film for at least 30 seconds with no breaks, droplets, or dry patches. A breaking film means residual oil or an inactive oxide, and the part should be re-cleaned rather than pushed forward. This test costs seconds and prevents most bare-spot rejects.
Variable Two: Bath Chemistry, Temperature, and Time
Chromate conversion baths are simple in principle and unforgiving in practice. The active chemistry, pH, temperature, and time interact, so a change in one is usually absorbed by adjusting another. The ranges below are typical starting points; the supplier technical data sheet and the drawing specification always take precedence.
- Active chemistry. Hexavalent baths are commonly controlled around 3.5 to 7.5 g/L of chromic acid equivalent and verified by titration once per shift. Trivalent products vary more between brands, so titration frequency and control limits should come directly from the supplier.
- pH. Hexavalent baths typically run at pH 1.5 to 2.5; trivalent chemical film products typically run at pH 3.5 to 4.5. Check with a calibrated meter every shift and after any addition.
- Temperature. Roughly 20 to 30 °C for hexavalent baths, 25 to 35 °C for many trivalent baths. Temperature has a strong effect on reaction rate; a 10 °C rise can shorten the required immersion time noticeably and raises the risk of a powdery coating.
- Immersion time. Commonly 30 seconds to 5 minutes, with 60 to 180 seconds covering most aluminum hardware. Spray and brush-on application are used for large parts and for touch-up, but immersion gives the most uniform result.
- Agitation and loading. Mild solution movement across all surfaces, no nesting of parts, and control of dissolved aluminum. Aluminum build-up is a leading cause of dull, uneven coatings and poor adhesion; filtration and a dump schedule based on titration and aluminum concentration keep it in check.
A practical point that surprises many buyers: alloy matters. Copper-bearing alloys such as 2024 and zinc-bearing 7075 react faster and coat darker than 6061 or 5052. A process approved on 6061 coupons can produce an over-coated, powdery result on 2024 parts. Witness coupons should always be the same alloy and temper as the production parts they represent.
Variable Three: Rinsing, Drying, and Handling
The coating is still chemically active when it leaves the bath. Rinsing stops the reaction, and drying and handling determine whether the layer stays intact.
- Rinsing. A drag-out rinse followed by a running rinse, then a final rinse with controlled water quality, is standard. Many coaters hold final rinse conductivity below 50 µS/cm and check it daily; hard rinse water leaves mineral spotting that shows up under paint.
- Drying. Blow off standing water from recesses first, then dry at ambient or in an oven capped around 60 to 70 °C. Excessive drying temperature or time can craze the coating and reduce corrosion performance, so the supplier's drying recommendation should be written into the work instruction.
- Handling. Clean gloves only. Bare-hand contact leaves fingerprint patterns that turn into corrosion sites within days, especially in humid storage. Coated parts should not be wiped with solvent or cloth.
- Paint window. If the part will be top-coated, define the interval between coating and painting and keep it in the purchase order. Many coaters work to 16 to 72 hours for best adhesion, and extended storage needs controlled humidity and clean packaging.
Blind holes and threaded recesses deserve specific attention. Trapped bath bleeds out after drying and appears as white or rust-colored staining a day later, which is often wrongly blamed on the bath. Drain holes, racking orientation, and a longer rinse cycle solve it.
The Full Sequence and Where Control Points Sit
- Incoming inspection of alloy, temper, and surface condition, plus a coupon of the same alloy prepared for coating weight testing.
- Alkaline cleaning with temperature, concentration, and time logged.
- Rinse, then deoxidize and desmut with etch condition checked visually.
- Final rinse with a water break test before the bath.
- Chromate conversion with titration, pH, temperature, and time recorded per batch.
- Rinse and dry, with the drying temperature logged.
- Visual inspection, coating weight on the witness coupon, and any electrical or salt spray checks the drawing calls for.
- Gloved handling, interleaved or bagged packaging, and batch identification for traceability.
Trivalent Versus Hexavalent in 2026
Regulatory pressure has reshaped this process. Hexavalent chromium is restricted under RoHS and under REACH authorisation, with narrow and continually reviewed allowances in aerospace and defence work. As a result, most commercial aluminum conversion coating specified today is trivalent chemical film, and buyers should expect suppliers to default to it unless the drawing names a hexavalent class for a justified reason.
| Attribute | Type I, hexavalent chromate | Type II, trivalent chemical film | Procurement implication |
|---|---|---|---|
| Typical appearance | Clear to iridescent gold | Clear to light blue, less iridescence | Color cannot be the only acceptance criterion |
| Coating weight | About 4.3 to 7.5 g/m2 for Class 1A; 1.0 g/m2 or less for Class 3 | Usually lower, often 0.3 to 1.0 g/m2 | Specify class and coating weight, not just a product name |
| Corrosion performance | Long field history, strong bare-corrosion resistance | Close to Type I on many alloys, more alloy sensitive | Require salt spray results on the actual production alloy |
| Electrical resistance | Low, well suited to Class 3 grounding | Low but slightly higher; must be verified | Confirm the contact resistance requirement is met |
| Regulatory status | Cr(VI) restricted, limited authorisations remain | RoHS compliant, no Cr(VI) authorisation needed | Expect Type II as the default in quotations |
| Process control | Mature and comparatively forgiving | Narrower pH and temperature window, sensitive to contamination | Ask for titration and pH records, not only a certificate |
Defect Analysis and Reject Criteria
Rejects are easier to argue about when the criteria are written into the drawing and the inspection plan. The list below covers what typically goes wrong and how to judge it.
- Bare spots or white patches. Traced to incomplete cleaning, poor deoxidizing, or silicone contamination. Reject any area where the coating is absent or clearly discontinuous.
- Powdery or easily rubbed coating. Caused by excessive temperature, long immersion, or high active chemistry. A light rub with a clean white cloth should not transfer visible powder.
- Dark, heavy, iridescent coating. Common on copper-bearing alloys and on over-active baths. Check coating weight against the drawing class rather than judging by color alone.
- Uneven color or streaks. Usually agitation, racking contact, or drag-out from a previous tank. Contact marks where parts touch are a legitimate reject.
- Fingerprints and handling stains. Handling failures, not bath failures. Reject, and correct the gloves and packaging instruction at the source.
- Bleed-out staining from recesses. Rinse and drying issue; parts can often be re-cleaned, but repeated stripping and recoating should be limited because it degrades the base surface.
- Paint adhesion failure after top-coating. Often a coating-to-paint interval or contamination problem rather than a conversion coating problem. Verify with a cross-hatch test per ASTM D3359, where class 4B or 5B is a common acceptance level.
Verification: What to Measure and How
- Coating weight. Gravimetric determination on a witness coupon using the stripping method cited in the governing specification. The coupon must match the production alloy and temper, and the test should run per lot, not once per year.
- Contact resistance. Required for Class 3 electrical applications, typically verified against a limit of 5000 micro-ohms using the method and probe load named in the specification.
- Salt spray. Neutral salt spray per ASTM B117, with 96 to 168 hours frequently called out on drawings. The pass criterion must come from the drawing and the alloy involved, since published data does not transfer automatically between alloys.
- Visual and dimensional. Uniform appearance under defined lighting, no bare areas, no rub-off, and confirmation that threads, grounding points, and sealing surfaces were masked as required.
- Process records. Titration, pH, temperature, immersion time, and rinse conductivity for each batch. These records are the fastest way to separate a coating line problem from an upstream machining or cleaning problem.
Drawing Notes, Masking, and Purchasing Details
Most coating disputes originate in the drawing, not the tank. A finish callout that says only chemical film leaves the coater to decide the class, the coating weight, and the electrical requirement, which is not a decision a supplier should be making for you.
- Name the specification, the type or class, and the coating weight range or electrical requirement.
- Identify surfaces that must be masked: threads, grounding and bonding points, weld areas, bearing surfaces, and sealing faces.
- State the color expectation as a range and confirm it visually against an approved sample, not a photograph.
- Define the interval allowed before top-coating if paint follows, and specify packaging for coated parts.
- Agree the rework policy in advance, including how many strip-and-recoat cycles are acceptable.
Cost and lead time follow from these details. Masking is manual labour and is frequently underestimated in quotations. A part with six masked threaded holes can cost more to finish than a larger unmasked bracket, and that difference shows up in the piece price rather than the coating cost itself.
Supplier Evaluation Points
When qualifying a coating partner, request evidence rather than assurances: current process sheets with control limits, titration and pH logs from the previous month, salt spray reports on the specific alloy, witness coupon records, and the masking method used for parts similar to yours. Ask which trivalent product family they run and what their dissolved aluminum control limit is. A supplier who can answer these questions quickly is usually controlling the process; one who answers only with certificates is not.
For plastic injection molded assemblies and hardware projects at HYNEU, chromate conversion coating usually enters the picture at the finishing stage of aluminum brackets, tool accessories, and structural hardware. Our work there is drawing review, finish specification, coordination with qualified coating partners, and incoming inspection against agreed acceptance criteria, with masking and electrical requirements settled before the first lot rather than after. Catching a missing class or an unmasked grounding point at drawing stage costs far less than sorting coated parts at the dock.
Recent Comments (0) 0
Leave a Reply