---
title: "Owen Jiang"
description: "Meet Owen Jiang, Production Process Engineer at Hynue, supporting manufacturing process review, sample trials, workflow improvement, and production issue analysis for plastic and metal components."
url: "https://www.hyneu.com/team/owen-jiang.html"
language: "en"
type: "ProfilePage"
category: "Manufacturing Team"
datePublished: "2026-10-21"
dateModified: "2026-10-29"
brand: "HYNEU"
manufacturer: "HYNEU"
---

# Owen Jiang

Owen Jiang works as a Production Process Engineer at Hynue, supporting manufacturing process review, trial production, workflow improvement, and day-to-day production problem analysis for both plastic and metal components. His role is closely connected to the factory floor and focuses on practical improvements that can be implemented within existing manufacturing conditions.

He participates in sample production and early manufacturing runs, observes production processes, records recurring issues, and communicates with production and quality teams about possible adjustments. Owen pays attention to process sequence, handling methods, production efficiency, and consistency during repeated manufacturing operations.

When projects move into regular production, he continues to support process follow-up and manufacturing issue analysis. His work helps production teams better understand process requirements and maintain more consistent execution over time.

- Manufacturing process review and production support
- Sample and trial production follow-up
- Injection molding and hardware workflow improvement
- Production issue analysis and practical corrective support
- Batch-manufacturing process consistency improvement

Owen believes that manufacturing improvement should be based on real production conditions. He focuses on simple, practical changes that can improve process clarity, reduce repeated issues, and make production easier to manage.

Through this approach, he supports Hynue in maintaining **practical and repeatable manufacturing processes** across general injection molded parts, hardware components, and related OEM or ODM projects.

## Start Your Manufacturing Project With HYNEU

Tell us about your product, material, quantity or production requirements. Our team will review your inquiry and discuss a practical manufacturing solution.

### Email:

[sales@hyneu.com](mailto:sales@hyneu.com)

### Phone:

+86 137 0174 6617

### WhatsApp:

[+86 137 0174 6617](https://wa.me/8613701746617)

### Factory Address:

Jinhua, Zhejaing, China

### Working Hours:
- Monday - Friday:8:30 AM - 17:30 PM

### Social Media
- [Facebook](https://www.facebook.com/hyneuworks)
- [X](https://x.com/hyneuworks)
- [YouTube](https://www.youtube.com/@hyneu)
- [TikTok](https://www.tiktok.com/@hyneuworks)

## Related Resources

- [Manufacturing Team](https://www.hyneu.com/team/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.hyneu.com/"},{"@type": "ListItem", "position": 2, "name": "Manufacturing Team", "item": "https://www.hyneu.com/team/"}
        ,{"@type": "ListItem", "position": 3, "name": "Owen Jiang"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "ProfilePage",
  	
  	"url": "https://www.hyneu.com/team/owen-jiang.html",
      "name": "Owen Jiang",
      "description": "Meet Owen Jiang, Production Process Engineer at Hynue, supporting manufacturing process review, sample trials, workflow improvement, and production issue analysis for plastic and metal components.",
      "datePublished": "2026-10-21T06:59:14Z",
      "dateModified": "2026-10-29T12:08:10Z"
  	
      ,"isPartOf": {
        "@type": "WebPage",
        "url": "https://www.hyneu.com/team/",
        "name": "Manufacturing Team"
      },
      "inLanguage":"en",
      "publisher":{ "@id":"https://www.hyneu.com/#organization" },
      "mainEntity": {
        "@type": "Person",
        "name": "Owen Jiang",
        "jobTitle": "Production Process Engineer",
        "url": "https://www.hyneu.com/team/owen-jiang.html"
      }
  }
]
```