---
title: "Grace Sun"
description: "Meet Grace Sun, Quality Assurance Lead at Hynue, supporting inspection planning, production quality control, non-conformance follow-up, and quality improvement for injection molded and hardware components."
url: "https://www.hyneu.com/team/grace-sun.html"
language: "en"
type: "ProfilePage"
category: "Manufacturing Team"
datePublished: "2026-10-21"
dateModified: "2026-10-29"
brand: "HYNEU"
manufacturer: "HYNEU"
---

# Grace Sun

Grace Sun works as the Quality Assurance Lead at Hynue, focusing on production quality coordination, inspection planning, issue follow-up, and continuous improvement for general plastic injection molded parts and hardware components. Her experience is centered on practical factory quality control rather than theoretical quality management alone.

At Hynue, Grace works with production, engineering, and inspection personnel to clarify quality requirements before manufacturing begins. She supports incoming material checks, in-process inspection arrangements, final inspection preparation, and communication related to non-conforming products when issues are identified.

She also participates in quality review during sample development and batch manufacturing. By comparing inspection findings with production conditions, Grace helps internal teams identify recurring issues, improve process discipline, and maintain clearer quality records throughout manufacturing.

- Production quality planning and inspection coordination
- Plastic injection molded part quality control
- Hardware and metal component inspection support
- Non-conformance follow-up and corrective action coordination
- Quality communication throughout sample and batch production

Grace believes that stable quality is achieved through consistent process control and timely communication. She focuses on preventing repeated problems by improving inspection awareness and strengthening cooperation between production and quality personnel.

Her practical approach helps Hynue maintain **consistent manufacturing quality** and provide customers with clear, responsible support throughout general OEM and ODM production projects.

## Start Your Manufacturing Project With HYNEU

Tell us about your product, material, quantity or production requirements. Our team will review your inquiry and discuss a practical manufacturing solution.

### Email:

[sales@hyneu.com](mailto:sales@hyneu.com)

### Phone:

+86 137 0174 6617

### WhatsApp:

[+86 137 0174 6617](https://wa.me/8613701746617)

### Factory Address:

Jinhua, Zhejaing, China

### Working Hours:
- Monday - Friday:8:30 AM - 17:30 PM

### Social Media
- [Facebook](https://www.facebook.com/hyneuworks)
- [X](https://x.com/hyneuworks)
- [YouTube](https://www.youtube.com/@hyneu)
- [TikTok](https://www.tiktok.com/@hyneuworks)

## Related Resources

- [Manufacturing Team](https://www.hyneu.com/team/)

## Structured Data

```json
[
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
        {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.hyneu.com/"},{"@type": "ListItem", "position": 2, "name": "Manufacturing Team", "item": "https://www.hyneu.com/team/"}
        ,{"@type": "ListItem", "position": 3, "name": "Grace Sun"}
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "ProfilePage",
  	
  	"url": "https://www.hyneu.com/team/grace-sun.html",
      "name": "Grace Sun",
      "description": "Meet Grace Sun, Quality Assurance Lead at Hynue, supporting inspection planning, production quality control, non-conformance follow-up, and quality improvement for injection molded and hardware components.",
      "datePublished": "2026-10-21T06:59:14Z",
      "dateModified": "2026-10-29T12:07:45Z"
  	
      ,"isPartOf": {
        "@type": "WebPage",
        "url": "https://www.hyneu.com/team/",
        "name": "Manufacturing Team"
      },
      "inLanguage":"en",
      "publisher":{ "@id":"https://www.hyneu.com/#organization" },
      "mainEntity": {
        "@type": "Person",
        "name": "Grace Sun",
        "jobTitle": "Quality Assurance Lead",
        "url": "https://www.hyneu.com/team/grace-sun.html"
      }
  }
]
```