---
title: "Can Wire EDM Cut Threaded Core Inserts for Plastic Injection Molds?"
description: "Buyer audits a wire EDMed M4x0.7 molded thread core after pitch drift and surface tearing; learn which process controls, measurements, and acceptance rules separate wire EDM error from drawing risk."
url: "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html"
language: "en"
type: "Q&A"
category: "Injection Molding Q&A"
datePublished: "2026-11-02"
dateModified: "2026-11-02"
brand: "HYNEU"
manufacturer: "HYNEU"
answerCount: 8
---

# Can Wire EDM Cut Threaded Core Inserts for Plastic Injection Molds?

## Question

 I am qualifying a new mold for a 30% glass-filled PBT housing with a molded M4x0.7 internal thread. The tooling supplier is proposing wire EDM for the threaded core insert rather than thread grinding. T1 samples show pitch diameter drift across the cavity and local surface tearing at the thread flanks. Our assembly line reports inconsistent screw engagement, while the supplier attributes the variation to normal wire EDM recast and our tight tolerance. Before I sign the mold acceptance or issue a corrective action, I need to know which process controls to audit, what dimensional and surface checks to use at incoming inspection, and where the realistic risk is: wire path condition, flush stability, wire tension, recast layer thickness, or our own thread drawing callouts. I do not want to reject a capable process, but I also cannot pass a mold that will create intermittent assembly rejects. What should I require from the tooling vendor and how should I evaluate the wire EDMed thread feature to separate process error from design risk? 

## Answers
                            
### Answer 1 — Best Answer

The core difference is process physics. Wire EDM is a thermal erosion process, not a form-cutting process like thread turning or thread grinding. A thread ground into steel is generated by a defined cutting edge, usually leaving a controlled flank profile and predictable surface stress. Wire EDM removes material with a traveling wire and pulsed spark discharge, so the thread form depends on CNC path, spark gap, wire diameter, wire tension, and flush stability. It also leaves a thin recast layer with a different metallurgical condition. For a screw thread feature, the difference appears in pitch diameter stability, root radius, flank texture, and edge condition. That does not make wire EDM unsuitable; it means acceptance cannot stop at a go/no-go thread gauge.

Wire EDM is generally more applicable for hardened thread cores, non-standard profiles, short lead times, and small thread details where grinding wheel access is limited. In an M4x0.7 core for a 30% glass-filled PBT housing, wire EDM can be capable if the vendor uses multiple skim cuts, stable wire guidance, controlled dielectric flushing, and proper recast control. It is less favorable when the same thread must be replicated across many cavities with very consistent assembly torque and no allowance for polishing or secondary finishing.

In your T1 case, the first step is to separate the steel insert from the molded part. **Measure the core insert before molding at the front, middle, and back of the thread length.** Record pitch diameter, thread angle, root radius, and lead/helix error using a thread micrometer or CMM with a thread probe. A functional go/no-go gauge will hide taper, local flank damage, and wire entry witness marks. If the insert geometry drifts along the thread length or across cavities, the cause is more likely wire path offset, wire wear, guide condition, flushing starvation, or insufficient skim passes than a drawing tolerance. If the steel insert is stable but the molded thread tears, focus on molding parameters, glass fiber orientation, mold release, and whether the EDM recast layer on the flanks is too rough or cracked.

During the supplier audit, require evidence of machine calibration, dielectric water condition, filter replacement, wire guide wear, wire type, wire diameter, wire speed, and **the number of skim cuts, wire type and diameter, wire tension, spark energy, wire speed, dielectric water condition, filter replacement, and guide wear**. A precision thread core should not be produced in one rough pass. Ask the vendor to show the wire entry and exit location and explain how they avoid a witness mark in the functional thread area. For hardened steel, require a defined procedure for removing or tempering the recast layer and verifying micro-cracking before final inspection.

At incoming inspection, check pitch diameter, root radius, thread angle, lead error, and flank roughness on a defined sample from each cavity. Add a surface roughness measurement on the flank and root, not only the crest. If possible, section one insert and examine recast layer thickness and crack depth. Then run **functional assembly testing at minimum and maximum material conditions with the actual screw**, recording insertion torque and thread engagement depth. This is more useful than a visual thread check because it captures cross-threading risk and assembly consistency.

The decision rule should be evidence-based. Accept wire EDM if the insert shows stable pitch diameter, controlled recast thickness, no crack network, acceptable flank roughness, and repeatable functional assembly across all cavities. If the drift follows the wire path or start point, or the recast layer is thick or cracked, rework the insert with revised parameters or move the final thread form to thread grinding. Do not approve the mold until both the steel thread form and the molded thread function are verified under production conditions.

**status:** accepted
**Author:** Aaron Fang
**Date:** 2026-11-02

### Answer 2

The acceptance should be driven by assembly behavior, not by steel thread dimensions alone. Measure insertion torque and thread engagement depth with the actual production screw at minimum and maximum material conditions.

A thread core can pass a pitch diameter check and still create cross-threading if the wire EDM entry mark sits in the first thread turn or if the root radius is too sharp.

Form a small assembly matrix across all cavities and at least three screw lots. If torque rises sharply or engagement depth varies more in one cavity, map that back to the insert rather than assuming the injection process is the cause.

In volume assembly, a narrow torque window matters more than an extremely tight thread profile, so define acceptable insertion torque and stripping torque limits before tooling acceptance.

Also inspect the first-thread geometry under magnification. Wire EDM tends to leave a different edge condition at the start point, and this can shave the screw or increase initial assembly effort.

If the issue is isolated to the start point, a local polish or relocation of the wire entry may solve it without changing the entire thread form.

**status:** suggested
**Author:** Marcus He
**Date:** 2026-11-02

### Answer 3

From an end-use perspective, evaluate the joint as a clamp load system. The molded thread must survive screw insertion, removal, thermal cycling, and load without cracking or losing clamp load.

A thread gauge does not show how a glass-filled PBT thread relaxes after assembly or how the thread flank transfers load into the plastic housing.

Run a thread stripping test and a repeated assembly test on molded samples from each cavity. Pay attention to failure mode. If the plastic thread strips at a consistent torque, the core geometry may be acceptable.

If the failure torque moves or the screw cracks, the wire EDMed surface may be creating stress concentration or material damage. Check whether the thread core has a sharp root or micro-cracked recast layer, because glass-filled PBT is abrasive and will expose those defects over time.

The application requirement should define the acceptance limit. If the joint is service-critical, require a minimum stripping-to-assembly torque ratio and a minimum number of insertion cycles.

A surface texture issue can be tolerated only if it does not reduce thread engagement below the design limit after environmental conditioning.

**status:** suggested
**Author:** Nathan Guo
**Date:** 2026-11-02

### Answer 4

The priority should be to convert a supplier opinion into process capability data. Measure pitch diameter across multiple cycles, cavities, and wire paths, then run a capability study on the steel insert before mold approval.

A stable wire EDM process should show tight within-thread variation. Large front-to-back taper or cavity-to-cavity spread indicates that input variables are not controlled.

Map the reject mode by location. If surface tearing appears only at the thread start or bottom, the issue may be flushing, wire entry, or reduced dielectric flow in blind sections.

If it appears randomly, check wire tension drift, guide wear, and filter condition. Request the vendor’s wire consumption and maintenance log as part of the audit.

Containment should be separated from corrective action. Incoming inspection can sort with a functional gauge and torque fixture, but preventing recurrence requires fixed EDM parameters, defined skim pass count, and periodic recast layer measurement.

Without that, each lot will require excessive sorting and the same debate will return at the next tooling change.

**status:** suggested
**Author:** Wendy Gao
**Date:** 2026-11-02

### Answer 5

Tool life should be part of the acceptance decision. A wire EDMed thread core for glass-filled PBT is subjected to abrasive flow, injection pressure, and repeated ejection.

If the core is hardened but retains a cracked recast layer, the thread crest may chip after a short production run, and the molded thread will gradually fall out of tolerance.

Specify the insert material and heat treatment, then ask how the vendor removes the white layer.

Micro-cracks can be reduced by lower spark energy, multiple skim cuts, targeted polishing, or a post-EDM stress-relief operation. Without this step, a precise initial dimension can degrade quickly under production.

Set a wear monitoring interval based on shot count and glass fiber loading. At each interval, measure the core and molded thread at the same cavity.

Track pitch diameter drift and surface roughness trend. This gives an objective trigger for recutting or replacing the insert before assembly rejects accumulate.

**status:** suggested
**Author:** Leo Shen
**Date:** 2026-11-02

### Answer 6

The wire EDM process is only one part of the thread quality risk. The mold structure around the threaded core determines how the plastic fills, packs, and releases.

If the thread is placed near a gate or at the end of a long flow path, filling variation can create molded thread distortion that looks like wire EDM error.

Check where the thread core is positioned, how it is vented, and how it is ejected. Internal threads in PBT can stick if the core surface is too rough or if there is insufficient draft on non-threaded portions.

The wire entry point should be kept off the load-bearing flank and away from the first engaged thread if possible.

DFM review should also include the thread runout and shutoff details. A sharp transition from the thread to the core seat can generate stress concentration during ejection.

Specifying a small blend or runout radius can reduce chipping risk and make the wire EDMed feature more robust without changing the thread function.

**status:** suggested
**Author:** Grace Sun
**Date:** 2026-11-02

### Answer 7

Molded defects should be separated from steel defects before changing the wire EDM process. T1 surface tearing on the thread flank can be caused by a rough insert, but it can also be caused by freezing the flow front too early, packing too low, or injecting too slowly, especially with a fine M4 thread in glass-filled PBT.

Run a short molding window study using the same insert. Vary injection speed, mold temperature, and packing pressure, then measure thread surface and pitch diameter.

If the defect changes with process settings, the problem is partly molding. If the tear remains at the same location in every setting, the insert surface or geometry is the dominant cause.

Also clean the insert after molding and inspect it under magnification. Glass fiber can pack into a rough EDM flank and create a false surface condition that transfers to the next shot.

A fine surface finish and controlled mold release can reduce fiber adhesion and make assembly torque more consistent.

**status:** suggested
**Author:** Claire Ren
**Date:** 2026-11-02

### Answer 8

Evaluate the vendor’s wire EDM strategy as a machining sequence, not as a black box. For a threaded core, the wire path, number of skim cuts, wire offset, corner control, and entry/exit position determine whether the pitch cylinder is round and whether the flanks are smooth enough for molding.

Ask for the actual wire diameter and offset values. If the vendor uses only one rough pass, the thread will likely show recast roughness and taper.

A proper sequence should include rough and multiple skim passes with controlled wire tension and dielectric flush. The thread should be measured at several angular positions to catch out-of-roundness and lead error.

Fixture and setup also matter. The core blank must be aligned along the thread axis. If the part is tilted or not indexed consistently, the pitch diameter will vary along the thread.

Require the vendor to document setup alignment and to demonstrate repeatability on at least three inserts before starting production.

**status:** suggested
**Author:** Irene Tang
**Date:** 2026-11-02

## Related Resources

- [Injection Molding Q&A](https://www.hyneu.com/questions/injection-molding/)
- [Plastic Injection Molding](https://www.hyneu.com/capabilities/injection-molding/)
- [Injection Molding Buying Guides](https://www.hyneu.com/buying-guides/injection-molding/)
- [Injection Molding Guide](https://www.hyneu.com/guides/injection-molding/)
- [Custom Manufacturing](https://www.hyneu.com/custom-manufacturing/)
- [Products](https://www.hyneu.com/products/)
- [Manufacturing Defects](https://www.hyneu.com/knowledge/manufacturing-defects/)
- [Mold & Tooling](https://www.hyneu.com/knowledge/mold-tooling/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "Can Wire EDM Cut Threaded Core Inserts for Plastic Injection Molds?",
        "text": "I am qualifying a new mold for a 30% glass-filled PBT housing with a molded M4x0.7 internal thread. The tooling supplier is proposing wire EDM for the threaded core insert rather than thread grinding. T1 samples show pitch diameter drift across the cavity and local surface tearing at the thread flanks. Our assembly line reports inconsistent screw engagement, while the supplier attributes the variation to normal wire EDM recast and our tight tolerance. Before I sign the mold acceptance or issue a corrective action, I need to know which process controls to audit, what dimensional and surface checks to use at incoming inspection, and where the realistic risk is: wire path condition, flush stability, wire tension, recast layer thickness, or our own thread drawing callouts. I do not want to reject a capable process, but I also cannot pass a mold that will create intermittent assembly rejects. What should I require from the tooling vendor and how should I evaluate the wire EDMed thread feature to separate process error from design risk?",
        "answerCount": 8,
        "upvoteCount": 9,
        "datePublished": "2026-11-02T09:38:52Z",
        "dateModified": "2026-11-02T09:51:04Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "The core difference is process physics. Wire EDM is a thermal erosion process, not a form-cutting process like thread turning or thread grinding. A thread ground into steel is generated by a defined cutting edge, usually leaving a controlled flank profile and predictable surface stress. Wire EDM removes material with a traveling wire and pulsed spark discharge, so the thread form depends on CNC path, spark gap, wire diameter, wire tension, and flush stability. It also leaves a thin recast layer with a different metallurgical condition. For a screw thread feature, the difference appears in pitch diameter stability, root radius, flank texture, and edge condition. That does not make wire EDM unsuitable; it means acceptance cannot stop at a go/no-go thread gauge. Wire EDM is generally more applicable for hardened thread cores, non-standard profiles, short lead times, and small thread details where grinding wheel access is limited. In an M4x0.7 core for a 30% glass-filled PBT housing, wire EDM can be capable if the vendor uses multiple skim cuts, stable wire guidance, controlled dielectric flushing, and proper recast control. It is less favorable when the same thread must be replicated across many cavities with very consistent assembly torque and no allowance for polishing or secondary finishing. In your T1 case, the first step is to separate the steel insert from the molded part. Measure the core insert before molding at the front, middle, and back of the thread length. Record pitch diameter, thread angle, root radius, and lead/helix error using a thread micrometer or CMM with a thread probe. A functional go/no-go gauge will hide taper, local flank damage, and wire entry witness marks. If the insert geometry drifts along the thread length or across cavities, the cause is more likely wire path offset, wire wear, guide condition, flushing starvation, or insufficient skim passes than a drawing tolerance. If the steel insert is stable but the molded thread tears, focus on molding parameters, glass fiber orientation, mold release, and whether the EDM recast layer on the flanks is too rough or cracked. During the supplier audit, require evidence of machine calibration, dielectric water condition, filter replacement, wire guide wear, wire type, wire diameter, wire speed, and the number of skim cuts, wire type and diameter, wire tension, spark energy, wire speed, dielectric water condition, filter replacement, and guide wear . A precision thread core should not be produced in one rough pass. Ask the vendor to show the wire entry and exit location and explain how they avoid a witness mark in the functional thread area. For hardened steel, require a defined procedure for removing or tempering the recast layer and verifying micro-cracking before final inspection. At incoming inspection, check pitch diameter, root radius, thread angle, lead error, and flank roughness on a defined sample from each cavity. Add a surface roughness measurement on the flank and root, not only the crest. If possible, section one insert and examine recast layer thickness and crack depth. Then run functional assembly testing at minimum and maximum material conditions with the actual screw , recording insertion torque and thread engagement depth. This is more useful than a visual thread check because it captures cross-threading risk and assembly consistency. The decision rule should be evidence-based. Accept wire EDM if the insert shows stable pitch diameter, controlled recast thickness, no crack network, acceptable flank roughness, and repeatable functional assembly across all cavities. If the drift follows the wire path or start point, or the recast layer is thick or cracked, rework the insert with revised parameters or move the final thread form to thread grinding. Do not approve the mold until both the steel thread form and the molded thread function are verified under production conditions.",
            "upvoteCount": 9,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#acceptedAnswer",
            "datePublished": "2026-11-02T10:32:44Z",
            "author": {"@type": "Person","name": "Aaron Fang","url": "https://www.hyneu.com/team/aaron-fang.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "The acceptance should be driven by assembly behavior, not by steel thread dimensions alone. Measure insertion torque and thread engagement depth with the actual production screw at minimum and maximum material conditions. A thread core can pass a pitch diameter check and still create cross-threading if the wire EDM entry mark sits in the first thread turn or if the root radius is too sharp. Form a small assembly matrix across all cavities and at least three screw lots. If torque rises sharply or engagement depth varies more in one cavity, map that back to the insert rather than assuming the injection process is the cause. In volume assembly, a narrow torque window matters more than an extremely tight thread profile, so define acceptable insertion torque and stripping torque limits before tooling acceptance. Also inspect the first-thread geometry under magnification. Wire EDM tends to leave a different edge condition at the start point, and this can shave the screw or increase initial assembly effort. If the issue is isolated to the start point, a local polish or relocation of the wire entry may solve it without changing the entire thread form.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-2",
            "datePublished": "2026-11-02T10:29:35Z",
            "author": {"@type": "Person","name": "Marcus He","url": "https://www.hyneu.com/team/marcus-he.html"}          }
          ,          {
            "@type": "Answer",
            "text": "From an end-use perspective, evaluate the joint as a clamp load system. The molded thread must survive screw insertion, removal, thermal cycling, and load without cracking or losing clamp load. A thread gauge does not show how a glass-filled PBT thread relaxes after assembly or how the thread flank transfers load into the plastic housing. Run a thread stripping test and a repeated assembly test on molded samples from each cavity. Pay attention to failure mode. If the plastic thread strips at a consistent torque, the core geometry may be acceptable. If the failure torque moves or the screw cracks, the wire EDMed surface may be creating stress concentration or material damage. Check whether the thread core has a sharp root or micro-cracked recast layer, because glass-filled PBT is abrasive and will expose those defects over time. The application requirement should define the acceptance limit. If the joint is service-critical, require a minimum stripping-to-assembly torque ratio and a minimum number of insertion cycles. A surface texture issue can be tolerated only if it does not reduce thread engagement below the design limit after environmental conditioning.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-3",
            "datePublished": "2026-11-02T10:27:28Z",
            "author": {"@type": "Person","name": "Nathan Guo","url": "https://www.hyneu.com/team/nathan-guo.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The priority should be to convert a supplier opinion into process capability data. Measure pitch diameter across multiple cycles, cavities, and wire paths, then run a capability study on the steel insert before mold approval. A stable wire EDM process should show tight within-thread variation. Large front-to-back taper or cavity-to-cavity spread indicates that input variables are not controlled. Map the reject mode by location. If surface tearing appears only at the thread start or bottom, the issue may be flushing, wire entry, or reduced dielectric flow in blind sections. If it appears randomly, check wire tension drift, guide wear, and filter condition. Request the vendor’s wire consumption and maintenance log as part of the audit. Containment should be separated from corrective action. Incoming inspection can sort with a functional gauge and torque fixture, but preventing recurrence requires fixed EDM parameters, defined skim pass count, and periodic recast layer measurement. Without that, each lot will require excessive sorting and the same debate will return at the next tooling change.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-4",
            "datePublished": "2026-11-02T10:07:13Z",
            "author": {"@type": "Person","name": "Wendy Gao","url": "https://www.hyneu.com/team/wendy-gao.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Tool life should be part of the acceptance decision. A wire EDMed thread core for glass-filled PBT is subjected to abrasive flow, injection pressure, and repeated ejection. If the core is hardened but retains a cracked recast layer, the thread crest may chip after a short production run, and the molded thread will gradually fall out of tolerance. Specify the insert material and heat treatment, then ask how the vendor removes the white layer. Micro-cracks can be reduced by lower spark energy, multiple skim cuts, targeted polishing, or a post-EDM stress-relief operation. Without this step, a precise initial dimension can degrade quickly under production. Set a wear monitoring interval based on shot count and glass fiber loading. At each interval, measure the core and molded thread at the same cavity. Track pitch diameter drift and surface roughness trend. This gives an objective trigger for recutting or replacing the insert before assembly rejects accumulate.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-5",
            "datePublished": "2026-11-02T10:00:27Z",
            "author": {"@type": "Person","name": "Leo Shen","url": "https://www.hyneu.com/team/leo-shen.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The wire EDM process is only one part of the thread quality risk. The mold structure around the threaded core determines how the plastic fills, packs, and releases. If the thread is placed near a gate or at the end of a long flow path, filling variation can create molded thread distortion that looks like wire EDM error. Check where the thread core is positioned, how it is vented, and how it is ejected. Internal threads in PBT can stick if the core surface is too rough or if there is insufficient draft on non-threaded portions. The wire entry point should be kept off the load-bearing flank and away from the first engaged thread if possible. DFM review should also include the thread runout and shutoff details. A sharp transition from the thread to the core seat can generate stress concentration during ejection. Specifying a small blend or runout radius can reduce chipping risk and make the wire EDMed feature more robust without changing the thread function.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-6",
            "datePublished": "2026-11-02T09:56:36Z",
            "author": {"@type": "Person","name": "Grace Sun","url": "https://www.hyneu.com/team/grace-sun.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Molded defects should be separated from steel defects before changing the wire EDM process. T1 surface tearing on the thread flank can be caused by a rough insert, but it can also be caused by freezing the flow front too early, packing too low, or injecting too slowly, especially with a fine M4 thread in glass-filled PBT. Run a short molding window study using the same insert. Vary injection speed, mold temperature, and packing pressure, then measure thread surface and pitch diameter. If the defect changes with process settings, the problem is partly molding. If the tear remains at the same location in every setting, the insert surface or geometry is the dominant cause. Also clean the insert after molding and inspect it under magnification. Glass fiber can pack into a rough EDM flank and create a false surface condition that transfers to the next shot. A fine surface finish and controlled mold release can reduce fiber adhesion and make assembly torque more consistent.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-7",
            "datePublished": "2026-11-02T09:54:19Z",
            "author": {"@type": "Person","name": "Claire Ren","url": "https://www.hyneu.com/team/claire-ren.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Evaluate the vendor’s wire EDM strategy as a machining sequence, not as a black box. For a threaded core, the wire path, number of skim cuts, wire offset, corner control, and entry/exit position determine whether the pitch cylinder is round and whether the flanks are smooth enough for molding. Ask for the actual wire diameter and offset values. If the vendor uses only one rough pass, the thread will likely show recast roughness and taper. A proper sequence should include rough and multiple skim passes with controlled wire tension and dielectric flush. The thread should be measured at several angular positions to catch out-of-roundness and lead error. Fixture and setup also matter. The core blank must be aligned along the thread axis. If the part is tilted or not indexed consistently, the pitch diameter will vary along the thread. Require the vendor to document setup alignment and to demonstrate repeatability on at least three inserts before starting production.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/wire-edm-threaded-core-inserts-plastic-injection-molds.html#suggestedAnswer-8",
            "datePublished": "2026-11-02T09:51:04Z",
            "author": {"@type": "Person","name": "Irene Tang","url": "https://www.hyneu.com/team/irene-tang.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.hyneu.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.hyneu.com/questions/"},{"@type": "ListItem", "position": 3, "name": "Injection Molding Q&A", "item": "https://www.hyneu.com/questions/injection-molding/"}          ,{"@type": "ListItem", "position": 4, "name": "Can Wire EDM Cut Threaded Core Inserts for Plastic Injection Molds?"}
      ]
    }
]
```