# How Should Purchasing Directors Qualify a Tool Handle Contract Manufacturer?

## Question

 I am a purchasing director at a manufacturer, currently managing multi-category component suppliers and preparing to consolidate a hand tool component supply base. I need to transfer a family of injection molded tool handles from a current vendor that has struggled with batch-to-batch dimensional variation and late PPAP submissions. The handles are used on ratchets, screwdrivers, and pry bars, so the new contract manufacturer may need to run glass-filled nylon and TPE overmolding depending on the part number. I want to qualify a new partner before releasing tooling, but I am not looking for a trading company or a shop that only runs simple black polypropylene parts. The immediate problem is that my engineering team has not fully frozen the overmold gate location for one high-volume screwdriver handle, and my quality group wants full dimensional layouts with CpK data on critical grip areas. At the same time, management expects the new supplier to reduce piece price by at least 10% without increasing mold transfer risk. What should I request in the RFQ, how should I evaluate tooling and process capability evidence, and where should I draw the line between cost savings and validation effort before committing to sampling? 

## Answers
                            
### Answer 1 — Best Answer

Start with the technical requirement package, not with pricing. Before sending the RFQ, freeze the screwdriver handle gate location and the overmold bond area. If the gate location is still open, split the quotation into a feasibility review and a price for the frozen design. This prevents suppliers from including allowances for uncertain tooling changes or comparing quotes that assume different gate positions.

Request material-specific processing evidence. Glass-filled nylon requires strict drying, wear-resistant screw and barrel components, and controlled mold temperature. The overmolded TPE requires a defined insert temperature and a compatible TPE grade or adhesion system. Ask the supplier to confirm the material grade, filler percentage, shrinkage, regrind policy, and second-shot process for each part number.

Quality requirements should be selective rather than uniform. **CpK data** should be required for dimensions affecting assembly, torque transfer, or grip retention, such as the insert bore or overmold thickness in the grip area. Cosmetic dimensions do not need the same statistical treatment. Request dimensional layout, cavity balance data, and a reaction plan for out-of-spec critical dimensions before tooling approval.

For cost analysis, require a breakdown into **tooling, piece price, and engineering or sampling charges**. This prevents hidden costs from being shifted into later piece price or “free sample” claims. The piece price should show material weight, grade, machine tonnage, hourly rate, cycle time, cavitation, scrap rate, and packaging cost. Without these assumptions, a lower total price can hide a higher scrap assumption, a weak tooling specification, or an unrealistic cycle time.

Normalize quotations before comparing. If one supplier quotes four cavities and another six, convert to per-cavity tool cost and estimated output per shift. Require each quotation to state the number of cavities, machine tonnage, cycle time, and scrap assumption under the same material grade. Otherwise an apparently lower piece price may be based on a higher scrap rate or a machine size that cannot run the required cavitation at the quoted rate.

Lead time must be reviewed as a sequence, not one date. Break it into design review, steel cutting, first trial, dimensional correction, overmold trial, PPAP documentation, and pilot run. For a new handle family, expect time for correction loops after the first trial. If the supplier quotes first trial to production without adjustment time, ask what assumptions they are making.

In supplier judgment, give the strongest weight to whether the supplier asks engineering questions before quoting. A suitable factory will ask for gate location options, draft angles, texture, assembly interface drawings, and whether the TPE is overmolded in the same machine or a second mold. A supplier that quotes from a photograph or a partial 3D file is less likely to control tooling risk.

Review similar tooling references in detail. Ask for a comparable glass-filled nylon overmolded hand tool mold, its cooling layout, ejection design, and maintenance records. Request a mold flow or filling simulation report that shows predicted weld lines, gas traps, and fill balance across cavities. If the supplier cannot explain the tooling design or refuses to share the simulation, remove them from the shortlist.

Use a phased commitment rather than transferring the entire handle family at once. Start with one high-volume screwdriver handle, complete the first PPAP, then release the ratchet and pry bar handles after the process is stable. This limits the commercial and technical exposure if the supplier cannot manage two-material production in a multi-cavity tool.

Compare suppliers on **total landed cost**, not piece price alone. Include tooling amortization, sampling charges, expected rejection cost, sorting or travel cost, and the cost of delayed PPAP. A 10% piece price reduction is realistic if the supplier can demonstrate shorter cycle time, lower scrap, better cavity utilization, or more competitive machine rates without reducing steel quality or inspection effort. Require the quote to explain the source of the saving. If the saving is not technical but simply “we are cheaper,” treat it as a risk indicator.

Before final commitment, ask for a small paid trial or a limited pilot order. Even a single-cavity prototype or a selected cavity trial will expose handling, measurement, and process discipline issues that a quotation cannot show. The final decision should be based on whether the supplier can move from sample approval to repeatable production under normal shop floor conditions, not only on whether they can produce one good set of samples.

**status:** accepted
**Author:** Leo Shen
**Date:** 2026-10-28

### Answer 2

For a hand tool handle family, one of the first signals of production reliability is whether the quoted cycle time matches the actual tooling and machine plan. Ask the supplier to separate first-shot cycle time, overmold cycle time, robot or manual loading time, and total takt time for each part number.

If the quoted piece price assumes four cavities but the machine clamp force, barrel capacity, or cooling circuit cannot support four balanced cavities, the cycle time will be meaningless during mass production.

Also review the automation fit. Glass-filled nylon and TPE overmolding can run consistently, but manual insert loading or manual part removal adds labor cost and creates variation in part temperature and bond strength.

A better quote should state whether the second shot is performed as a separate mold or as an overmolding process with the nylon insert retained, and whether end-of-arm tooling or fixture location is designed into the process.

Finally, request a production simulation or at least a machine layout for the handle family.

The evaluation should include whether the supplier has enough machine capacity to run the required cavitation without sharing a press with high-changeover jobs. That affects not only unit cost but also scheduling reliability.

**status:** suggested
**Author:** Marcus He
**Date:** 2026-10-28

### Answer 3

Do not accept a single “glass-filled nylon” description. Request the exact resin grade, glass fiber percentage, impact modifier package, and moisture conditioning method.

Different nylon 6 and nylon 66 grades have meaningful differences in stiffness, toughness, and mold shrinkage. For a screwdriver or pry bar handle, a grade with too much glass may create brittle failure under side load, while too low glass may reduce creep resistance and cause the handle to loosen on the tool shank.

For TPE overmolding, focus on bond strength. The TPE supplier should specify the compatible nylon grade or a primer/adhesion system.

Mold temperature and insert surface temperature before overmolding affect adhesion more than hardness alone. Ask for peel or pull-out data from a representative molded sample rather than only a material datasheet.

Cost should be judged by material yield and regrind policy. If glass-filled nylon regrind is reused, require a fixed maximum percentage and verify that impact and dimensional stability remain within specification.

A lower material price can be offset by higher scrap, higher drying cost, or bond failures during assembly.

**status:** suggested
**Author:** Claire Ren
**Date:** 2026-10-28

### Answer 4

Before committing to tooling, confirm which market compliance documents must be available for the handle materials and finished hand tool components. Ask for REACH, RoHS, and, where applicable, California Prop 65 declarations at the material and colorant level.

Tool handles made with TPE may contain plasticizers, stabilizers, or colorants that require review under consumer product regulations, even if the tool itself is industrial.

Request a compliance file before first samples, not at mass production. The file should include material safety data sheets, resin supplier declarations, colorant declarations, and any migration or odor test results if the handle is marketed for prolonged skin contact.

If the supplier is unfamiliar with these documents or cannot trace the material batch to the final cavity, treat that as a sourcing risk.

For quality documentation, the supplier should be able to produce a control plan and inspection report that links material credentials to the cavity, production date, and lot number. This becomes important when a customer or customs authority requests evidence after shipment.

**status:** suggested
**Author:** Nathan Guo
**Date:** 2026-10-28

### Answer 5

Review the proposed tooling structure before comparing machine rate or piece price. For glass-filled nylon, the cavity and gate should use wear-resistant steel in high-flow areas, not standard carbon steel throughout.

Ask where hardened inserts or coatings are planned, and how the supplier will maintain gate and parting line condition over the expected tool life. A low tooling quote that uses soft steel for a glass-filled grade will create flash and dimensional drift after a short production run.

The overmold tool needs special attention to insert placement and shutoff. Ask for the proposed ejection sequence, insert retention method, and slide or lifter plan.

If the nylon substrate is moved from the first mold to the second mold manually, the tool should include positive location features so the second shot does not shift and create uneven wall thickness or exposed substrate.

Maintenance should be defined as a commitment rather than a vague promise. Request the supplier’s preventive maintenance interval, number of shots between cleaning, and spare insert or slide availability.

For a high-volume handle, tool maintenance downtime can be more damaging than the initial tooling price difference.

**status:** suggested
**Author:** Irene Tang
**Date:** 2026-10-28

### Answer 6

For hand tool handles, define defect classes before the first trial. Critical defects include short shots in the torque transfer area, voids in the overmold bond zone, cracks near insert edges, excessive sink around bosses, and warpage that prevents assembly.

Major defects may include visible weld lines in the grip area, color variation, gloss difference, or surface delamination. Minor defects are those that do not affect fit, function, or safety.

Inspection should not rely only on first article layout. Ask the supplier to show in-process inspection checkpoints for appearance, insert coverage, weight, and critical dimensions.

The IQC should verify resin grade and moisture before molding. IPQC should monitor part weight, melt cushion, and overmold adhesion at defined intervals. OQC should confirm assembly fit and packaging, not just dimensional conformance.

When a critical dimension fails, the supplier should provide more than a replacement sample. Request corrective action with root cause analysis, process parameter change, and re-validation data. A factory that can show this loop clearly is better than one that only promises to “improve next time.”

**status:** suggested
**Author:** Aaron Fang
**Date:** 2026-10-28

### Answer 7

Structure the qualification as a stage-gated process instead of one large tooling order. Use a design review milestone, a tooling cut steel approval, a first trial review, overmold trial approval, and a PPAP or production part approval milestone.

At each gate, freeze only the decisions that must be final before spending more money. The open gate location on the screwdriver handle should be resolved before tooling start, but surface texture or packaging can be confirmed later if they do not affect mold design.

Change management is more important than the initial quotation. Ask the supplier to define how they will record engineering changes, material changes, cavity changes, or process changes during sampling and mass production.

A production transfer often fails when a small parameter change is made between samples and pilot run without traceability. Require a documented change record with part number, tool number, cavity, date, and customer approval status.

For production transfer readiness, build a pilot run into the schedule before full volume orders. The pilot should run with production tooling, production resin lots, and production operators, not development staff.

Compare the pilot output to PPAP samples and confirm that the supplier can meet the delivery and inspection cadence under normal load. This reduces the risk of approving a capable sample but receiving an unstable production lot.

**status:** suggested
**Author:** Victor Luo
**Date:** 2026-10-28

## Related Resources

- [Custom Manufacturing Q&A](https://www.hyneu.com/questions/custom-manufacturing/)
- [Custom Manufacturing](https://www.hyneu.com/custom-manufacturing/)
- [OEM Manufacturing](https://www.hyneu.com/custom-manufacturing/oem/)
- [ODM Manufacturing](https://www.hyneu.com/custom-manufacturing/odm/)
- [Contract Manufacturing](https://www.hyneu.com/custom-manufacturing/contract/)
- [Capabilities](https://www.hyneu.com/capabilities/)
- [Products](https://www.hyneu.com/products/)
- [Buying Guides](https://www.hyneu.com/buying-guides/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How Should Purchasing Directors Qualify a Tool Handle Contract Manufacturer?",
        "text": "I am a purchasing director at a manufacturer, currently managing multi-category component suppliers and preparing to consolidate a hand tool component supply base. I need to transfer a family of injection molded tool handles from a current vendor that has struggled with batch-to-batch dimensional variation and late PPAP submissions. The handles are used on ratchets, screwdrivers, and pry bars, so the new contract manufacturer may need to run glass-filled nylon and TPE overmolding depending on the part number. I want to qualify a new partner before releasing tooling, but I am not looking for a trading company or a shop that only runs simple black polypropylene parts. The immediate problem is that my engineering team has not fully frozen the overmold gate location for one high-volume screwdriver handle, and my quality group wants full dimensional layouts with CpK data on critical grip areas. At the same time, management expects the new supplier to reduce piece price by at least 10% without increasing mold transfer risk. What should I request in the RFQ, how should I evaluate tooling and process capability evidence, and where should I draw the line between cost savings and validation effort before committing to sampling?",
        "answerCount": 7,
        "upvoteCount": 9,
        "datePublished": "2026-10-28T00:35:52Z",
        "dateModified": "2026-10-28T00:38:20Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "Start with the technical requirement package, not with pricing. Before sending the RFQ, freeze the screwdriver handle gate location and the overmold bond area. If the gate location is still open, split the quotation into a feasibility review and a price for the frozen design. This prevents suppliers from including allowances for uncertain tooling changes or comparing quotes that assume different gate positions. Request material-specific processing evidence. Glass-filled nylon requires strict drying, wear-resistant screw and barrel components, and controlled mold temperature. The overmolded TPE requires a defined insert temperature and a compatible TPE grade or adhesion system. Ask the supplier to confirm the material grade, filler percentage, shrinkage, regrind policy, and second-shot process for each part number. Quality requirements should be selective rather than uniform. CpK data should be required for dimensions affecting assembly, torque transfer, or grip retention, such as the insert bore or overmold thickness in the grip area. Cosmetic dimensions do not need the same statistical treatment. Request dimensional layout, cavity balance data, and a reaction plan for out-of-spec critical dimensions before tooling approval. For cost analysis, require a breakdown into tooling, piece price, and engineering or sampling charges . This prevents hidden costs from being shifted into later piece price or “free sample” claims. The piece price should show material weight, grade, machine tonnage, hourly rate, cycle time, cavitation, scrap rate, and packaging cost. Without these assumptions, a lower total price can hide a higher scrap assumption, a weak tooling specification, or an unrealistic cycle time. Normalize quotations before comparing. If one supplier quotes four cavities and another six, convert to per-cavity tool cost and estimated output per shift. Require each quotation to state the number of cavities, machine tonnage, cycle time, and scrap assumption under the same material grade. Otherwise an apparently lower piece price may be based on a higher scrap rate or a machine size that cannot run the required cavitation at the quoted rate. Lead time must be reviewed as a sequence, not one date. Break it into design review, steel cutting, first trial, dimensional correction, overmold trial, PPAP documentation, and pilot run. For a new handle family, expect time for correction loops after the first trial. If the supplier quotes first trial to production without adjustment time, ask what assumptions they are making. In supplier judgment, give the strongest weight to whether the supplier asks engineering questions before quoting. A suitable factory will ask for gate location options, draft angles, texture, assembly interface drawings, and whether the TPE is overmolded in the same machine or a second mold. A supplier that quotes from a photograph or a partial 3D file is less likely to control tooling risk. Review similar tooling references in detail. Ask for a comparable glass-filled nylon overmolded hand tool mold, its cooling layout, ejection design, and maintenance records. Request a mold flow or filling simulation report that shows predicted weld lines, gas traps, and fill balance across cavities. If the supplier cannot explain the tooling design or refuses to share the simulation, remove them from the shortlist. Use a phased commitment rather than transferring the entire handle family at once. Start with one high-volume screwdriver handle, complete the first PPAP, then release the ratchet and pry bar handles after the process is stable. This limits the commercial and technical exposure if the supplier cannot manage two-material production in a multi-cavity tool. Compare suppliers on total landed cost , not piece price alone. Include tooling amortization, sampling charges, expected rejection cost, sorting or travel cost, and the cost of delayed PPAP. A 10% piece price reduction is realistic if the supplier can demonstrate shorter cycle time, lower scrap, better cavity utilization, or more competitive machine rates without reducing steel quality or inspection effort. Require the quote to explain the source of the saving. If the saving is not technical but simply “we are cheaper,” treat it as a risk indicator. Before final commitment, ask for a small paid trial or a limited pilot order. Even a single-cavity prototype or a selected cavity trial will expose handling, measurement, and process discipline issues that a quotation cannot show. The final decision should be based on whether the supplier can move from sample approval to repeatable production under normal shop floor conditions, not only on whether they can produce one good set of samples.",
            "upvoteCount": 9,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#acceptedAnswer",
            "datePublished": "2026-10-28T00:57:07Z",
            "author": {"@type": "Person","name": "Leo Shen","url": "https://www.hyneu.com/team/leo-shen.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For a hand tool handle family, one of the first signals of production reliability is whether the quoted cycle time matches the actual tooling and machine plan. Ask the supplier to separate first-shot cycle time, overmold cycle time, robot or manual loading time, and total takt time for each part number. If the quoted piece price assumes four cavities but the machine clamp force, barrel capacity, or cooling circuit cannot support four balanced cavities, the cycle time will be meaningless during mass production. Also review the automation fit. Glass-filled nylon and TPE overmolding can run consistently, but manual insert loading or manual part removal adds labor cost and creates variation in part temperature and bond strength. A better quote should state whether the second shot is performed as a separate mold or as an overmolding process with the nylon insert retained, and whether end-of-arm tooling or fixture location is designed into the process. Finally, request a production simulation or at least a machine layout for the handle family. The evaluation should include whether the supplier has enough machine capacity to run the required cavitation without sharing a press with high-changeover jobs. That affects not only unit cost but also scheduling reliability.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#suggestedAnswer-2",
            "datePublished": "2026-10-28T00:53:01Z",
            "author": {"@type": "Person","name": "Marcus He","url": "https://www.hyneu.com/team/marcus-he.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Do not accept a single “glass-filled nylon” description. Request the exact resin grade, glass fiber percentage, impact modifier package, and moisture conditioning method. Different nylon 6 and nylon 66 grades have meaningful differences in stiffness, toughness, and mold shrinkage. For a screwdriver or pry bar handle, a grade with too much glass may create brittle failure under side load, while too low glass may reduce creep resistance and cause the handle to loosen on the tool shank. For TPE overmolding, focus on bond strength. The TPE supplier should specify the compatible nylon grade or a primer/adhesion system. Mold temperature and insert surface temperature before overmolding affect adhesion more than hardness alone. Ask for peel or pull-out data from a representative molded sample rather than only a material datasheet. Cost should be judged by material yield and regrind policy. If glass-filled nylon regrind is reused, require a fixed maximum percentage and verify that impact and dimensional stability remain within specification. A lower material price can be offset by higher scrap, higher drying cost, or bond failures during assembly.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#suggestedAnswer-3",
            "datePublished": "2026-10-28T00:52:09Z",
            "author": {"@type": "Person","name": "Claire Ren","url": "https://www.hyneu.com/team/claire-ren.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Before committing to tooling, confirm which market compliance documents must be available for the handle materials and finished hand tool components. Ask for REACH, RoHS, and, where applicable, California Prop 65 declarations at the material and colorant level. Tool handles made with TPE may contain plasticizers, stabilizers, or colorants that require review under consumer product regulations, even if the tool itself is industrial. Request a compliance file before first samples, not at mass production. The file should include material safety data sheets, resin supplier declarations, colorant declarations, and any migration or odor test results if the handle is marketed for prolonged skin contact. If the supplier is unfamiliar with these documents or cannot trace the material batch to the final cavity, treat that as a sourcing risk. For quality documentation, the supplier should be able to produce a control plan and inspection report that links material credentials to the cavity, production date, and lot number. This becomes important when a customer or customs authority requests evidence after shipment.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#suggestedAnswer-4",
            "datePublished": "2026-10-28T00:51:26Z",
            "author": {"@type": "Person","name": "Nathan Guo","url": "https://www.hyneu.com/team/nathan-guo.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Review the proposed tooling structure before comparing machine rate or piece price. For glass-filled nylon, the cavity and gate should use wear-resistant steel in high-flow areas, not standard carbon steel throughout. Ask where hardened inserts or coatings are planned, and how the supplier will maintain gate and parting line condition over the expected tool life. A low tooling quote that uses soft steel for a glass-filled grade will create flash and dimensional drift after a short production run. The overmold tool needs special attention to insert placement and shutoff. Ask for the proposed ejection sequence, insert retention method, and slide or lifter plan. If the nylon substrate is moved from the first mold to the second mold manually, the tool should include positive location features so the second shot does not shift and create uneven wall thickness or exposed substrate. Maintenance should be defined as a commitment rather than a vague promise. Request the supplier’s preventive maintenance interval, number of shots between cleaning, and spare insert or slide availability. For a high-volume handle, tool maintenance downtime can be more damaging than the initial tooling price difference.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#suggestedAnswer-5",
            "datePublished": "2026-10-28T00:46:09Z",
            "author": {"@type": "Person","name": "Irene Tang","url": "https://www.hyneu.com/team/irene-tang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "For hand tool handles, define defect classes before the first trial. Critical defects include short shots in the torque transfer area, voids in the overmold bond zone, cracks near insert edges, excessive sink around bosses, and warpage that prevents assembly. Major defects may include visible weld lines in the grip area, color variation, gloss difference, or surface delamination. Minor defects are those that do not affect fit, function, or safety. Inspection should not rely only on first article layout. Ask the supplier to show in-process inspection checkpoints for appearance, insert coverage, weight, and critical dimensions. The IQC should verify resin grade and moisture before molding. IPQC should monitor part weight, melt cushion, and overmold adhesion at defined intervals. OQC should confirm assembly fit and packaging, not just dimensional conformance. When a critical dimension fails, the supplier should provide more than a replacement sample. Request corrective action with root cause analysis, process parameter change, and re-validation data. A factory that can show this loop clearly is better than one that only promises to “improve next time.”",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#suggestedAnswer-6",
            "datePublished": "2026-10-28T00:40:41Z",
            "author": {"@type": "Person","name": "Aaron Fang","url": "https://www.hyneu.com/team/aaron-fang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Structure the qualification as a stage-gated process instead of one large tooling order. Use a design review milestone, a tooling cut steel approval, a first trial review, overmold trial approval, and a PPAP or production part approval milestone. At each gate, freeze only the decisions that must be final before spending more money. The open gate location on the screwdriver handle should be resolved before tooling start, but surface texture or packaging can be confirmed later if they do not affect mold design. Change management is more important than the initial quotation. Ask the supplier to define how they will record engineering changes, material changes, cavity changes, or process changes during sampling and mass production. A production transfer often fails when a small parameter change is made between samples and pilot run without traceability. Require a documented change record with part number, tool number, cavity, date, and customer approval status. For production transfer readiness, build a pilot run into the schedule before full volume orders. The pilot should run with production tooling, production resin lots, and production operators, not development staff. Compare the pilot output to PPAP samples and confirm that the supplier can meet the delivery and inspection cadence under normal load. This reduces the risk of approving a capable sample but receiving an unstable production lot.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/qualify-tool-handle-contract-manufacturer.html#suggestedAnswer-7",
            "datePublished": "2026-10-28T00:38:20Z",
            "author": {"@type": "Person","name": "Victor Luo","url": "https://www.hyneu.com/team/victor-luo.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.hyneu.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.hyneu.com/questions/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.hyneu.com/questions/custom-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "How Should Purchasing Directors Qualify a Tool Handle Contract Manufacturer?"}
      ]
    }
]
```