# What Tolerances Are Required for Power Tool Standard Drill Housings?

## Question

 I manage purchasing for a power tool manufacturer and am currently sourcing injection-molded standard drill housings for a new 750 W corded drill platform. We have 3D and 2D drawings, but our current supplier has repeated problems: boss cracking during screw torque, sink marks near the motor seat, and dimensional drift around the gearbox flange after molding. We need the housing to withstand vibration from a 0–2800 rpm variable-speed drivetrain without audible rattling or screw loosening in life testing. I am trying to compare quotes from several molders, but the unit prices and tooling costs vary widely. Some suppliers quote PA6-GF30, others suggest PC+ABS or PA6+GF15, and they disagree on gate location and draft angles. I need to know what information should be locked before tooling, which tolerances are realistic for critical bearing bores and gearbox mating faces, and what sampling or inspection evidence I should request before approving pilot production. My real concern is balancing upfront tooling cost against long-term rejection risk. What should I require in the quote, tooling plan, and first-article report so I can compare suppliers fairly instead of just choosing the lowest price? 

## Answers
                            
### Answer 1 — Best Answer

For a 750 W corded drill housing, the first requirement is not a quotation. It is a controlled input pack: frozen 3D and 2D drawings, material specification, surface finish and texture, insert or boss requirements, gasket or mating part data, and the expected load cases. Separate the drawing into cosmetic surfaces, structural areas around the motor and gearbox, and assembly interfaces. This prevents suppliers from quoting against different interpretations.

On material, PA6-GF30 is usually the strongest starting point for this application because of rigidity, heat resistance, and better dimensional stability under load. PC+ABS or PA6+GF15 may be acceptable only if the supplier explains what problem they solve. A lower glass content normally reduces stiffness and can increase creep around hot gearbox areas. If two quotes use different materials, unit price comparison is meaningless. Specify the exact grade, heat stabilizer, regrind limit, and any impact modifier before tooling.

The most important decision is to **freeze the material grade and critical-to-function dimensions before releasing tooling**. For injection-molded glass-filled nylon, general dimensions can often be held to ±0.1 mm and larger bosses or housing lengths to ±0.2 mm, but bearing bores and gearbox spigot positions need a separate study. If a bearing seat needs IT7 or tighter, it is usually not reliable to hold directly from the molded hole; plan a secondary boring operation, a steel insert, or a tolerance stack-up exercise. Use GD&T and measure the assembled housing, not only the two half shells.

Boss cracking should be treated as a design and tooling risk, not only a material problem. The boss root should have a radius, wall thickness should be reduced to roughly 60–70% of the nominal wall if possible, and load-bearing bosses should have gussets tied to side walls. Screw type, thread engagement, and tightening torque must be fixed before tooling. Gate location should not produce a weld line through a screw boss or a thin bearing wall; ask for mold flow analysis at DFM stage.

For tooling, require the supplier to state proposed steel and hardness because glass-filled nylon is abrasive. Hardened gate inserts, wear plates at shutoffs, and sufficient venting improve both life and part quality. A hot runner system may reduce regrind and improve cycle time, but it raises tooling cost and maintenance complexity. For a standard housing produced over a long run, that trade-off may still make sense if the supplier quantifies the cycle-time and regrind saving.

Cost and lead time must be compared on a **normalized quotation**. That means same material grade, same cavity count, same steel family, same surface finish, same secondary operations, same tolerances, and same sampling deliverables. A lower unit price often means softer steel, fewer cooling channels, more regrind, or secondary operations excluded. Express total cost as tooling plus expected unit cost over a defined production volume, including sampling, scrap, and any rework allowance. Tooling lead time normally runs from drawing freeze to T1 samples, and any design change after steel cutting adds time and cost, so do not start with uncertain geometry.

Before pilot production, require a first-article dimensional report across all cavities, material certificates, shrinkage data, and a **30-shot process capability study** for the critical bores, gearbox landing faces, and boss positions. For vibration risk, ask the supplier to assemble test housings with the specified screws and measure torque retention after a vibration or loaded run cycle. If the housing is only measured as two loose halves, you can miss the exact mismatch that causes rattling.

Pilot production should run on the same press, same mold, same cycle, and same material lot family that will be used for mass production. Request process parameters, cavity pressure or shot weight limits, and a reaction plan for out-of-control conditions. This is more useful than a perfect sample set produced under laboratory-style conditions.

Supplier judgment should consider how the supplier responds to the DFM review. A strong supplier will ask for the gearbox mating component, motor bearing arrangement, and screw torque values, then propose gate location, steel selection, and tolerance splits. A weak supplier will simply quote unit price and say no changes are needed. Check measurement capability, cavity-to-cavity control, mold maintenance plan, and change control before awarding the tool.

In decision terms, do not compare quotes from suppliers that have not confirmed the same input basis. Shortlist suppliers by engineering response first, then compare normalized commercial terms. The target is not only a low piece price but a housing that keeps gearbox alignment stable, survives vibration without boss cracking, and can be produced repeatably across cavities.

**status:** accepted
**Author:** Evan Qian
**Date:** 2026-11-01

### Answer 2

For a split housing, the real risk is not individual half-shell dimensions but the assembled stack of motor bearing bore, gearbox spigot, and screw boss seating faces.

Ask the supplier to measure a small batch of assembled housings against a machined gearbox fixture or a fixed coordinate scheme. If each half shell is only checked to ±0.1 mm with different datums, the combined misalignment can be enough to change gear mesh load and produce vibration.

During the pilot build, record screw tightening sequence and clamp gap. Diagonal tightening should close the housing without tilting the gearbox flange.

If the gap change across the joint is inconsistent, the problem is usually warpage or boss-to-boss mismatch, not screw torque. This is why first-article inspection should include assembly-level flatness and parallelism, not just loose-part dimensions.

A useful acceptance condition is to assemble ten sets with production screws and repeatedly measure gearbox seat alignment.

If variation is high even when all individual dimensions pass, the tolerance scheme needs to be changed before mass production. That data protects assembly yield more than a single-part Cpk value.

**status:** suggested
**Author:** Aaron Fang
**Date:** 2026-11-01

### Answer 3

Before pilot builds, agree on boundary samples and defect classes for glass-filled nylon drill housings. Flow lines and blush on a non-visible internal wall may be acceptable, but sink near a boss root, a weld line through a bearing support, short shots, or exposed glass fibers on a sealing land should be treated as critical.

Define critical, major, and minor defects before inspection starts; otherwise the supplier and buyer will argue about cosmetic issues during shipment.

Incoming material control should verify resin lot, moisture content, and regrind ratio if the material is dried or blended internally. At the injection process, monitor melt cushion, fill time, holding pressure, and shot weight.

At outgoing inspection, combine dimensional checks with assembly fit, screw torque on bosses, and visual limits. Do not rely on final sorting to catch instability; ask the supplier to link defects to process parameters.

If boss cracking appears during testing, request a corrective action that identifies the root cause: poor knit line location, excessive regrind, overheating, insufficient packing, or design stress.

Containment sorting is not enough. The supplier should show how the process window will be tightened so the defect does not return in the next cavity or batch.

**status:** suggested
**Author:** Owen Jiang
**Date:** 2026-11-01

### Answer 4

Quotation comparison should be tied to a milestone plan, not just tooling price. Once the drawing is frozen, the sequence should be DFM approval, steel cutting, T1 samples, dimensional report, assembly trial, T2 correction if needed, pilot run, and mass production transfer.

Ask each supplier to state the expected duration between those milestones and what they require from the buyer at each gate. This exposes whether a low price includes enough engineering and correction loops.

Sample approval should be conditional: a dimensionally good housing that fails screw torque retention or gearbox fit is not approved. The sign-off should reference material certificates, cavity identification, process parameters, and dimensional reports.

Any later change to material batch, gate position, steel repair, or process settings should require written risk assessment and a new sample submission. This prevents silent changes during scaling.

Production readiness is not the same as sample approval. Before transfer, verify that the tool can run a full pilot on the intended production press, that operators have setup limits, that critical spare parts are defined, and that packaging prevents warpage during transport.

A supplier that treats pilot as a formality will create problems after ramp-up.

**status:** suggested
**Author:** Nathan Guo
**Date:** 2026-11-01

### Answer 5

Glass-filled nylon is abrasive, so tooling steel choice directly affects long-run dimensional stability. A low quote using soft steel may look acceptable at T1 but will lose shutoff accuracy and develop flash after higher shot counts.

Ask suppliers to state steel type, hardness, and expected life in shots for core, cavity, gate inserts, and shutoff areas. This should be part of the normalized comparison.

Tooling tolerances must be tighter than part tolerances because glass-filled nylon shrinks non-uniformly. For critical bores and gearbox faces, ask how the mold maker compensates for shrinkage and fiber orientation.

Gate location and gate size affect weld line position and boss strength. If the supplier cannot show mold flow results or explain the gate decision, the risk is being hidden inside the tool price.

Maintenance should be scheduled before it becomes an emergency. For a high-volume housing tool, spare gate inserts, ejector pins, and wear plates should be available.

The quotation should clarify whether insert replacement is included in tool life and how cavity-to-cavity variation will be checked after maintenance. A tool with no spare inserts may force a long production stoppage for a small worn component.

**status:** suggested
**Author:** Wendy Gao
**Date:** 2026-11-01

### Answer 6

The housing cannot be validated only on dimensional sheets. It must hold gearbox alignment and screw torque under vibration across the speed range.

Ask for a functional conditioning test: assemble the housing with production screws and a dummy gearbox or actual drive train, run at multiple speeds including resonance conditions if known, then recheck torque. A housing that is quiet for the first hour may loosen if the boss compresses or the thread relaxes.

Heat is another variable. The motor and gearbox raise local temperature, which softens the boss area over time. In PA6-GF30, moisture conditioning also changes stiffness and thread retention.

Therefore, torque retention should be checked after heat soak and after moisture conditioning, not only on dry as-molded housings. This gives a more realistic life indication than a standard tensile test coupon.

For end-use fit, the gearbox mating face should be checked under radial load and during screw tightening. The failure to avoid is a small initial step that grows into wear, noise, and crack initiation.

A short pilot durability test with a real motor is worth more than a large dimensional sample set without assembly load.

**status:** suggested
**Author:** Irene Tang
**Date:** 2026-11-01

### Answer 7

One good sample set is not evidence of repeatability. Ask the supplier for a process window study rather than a single process point.

Injection speed, melt temperature, mold temperature, packing pressure, and cooling time all affect sink, warpage, boss cracking, and cavity balance. If the supplier is running near the edge of the process window, dimensional results will drift with ordinary batch variation.

For a multi-cavity tool, request cavity-by-cavity capability data. If one cavity has lower Cpk, the supplier may simply increase inspection or sort parts, which hides the problem.

The better response is to correct runner balance, gate size, or cooling so cavities behave similarly. This reduces total inspection cost and improves assembly consistency.

From a continuous improvement view, compare suppliers on how they prevent defects, not how fast they sort them. In-process trend charts, cavity pressure monitoring, and defined reaction limits are stronger evidence than a perfect first article.

A slightly higher unit price may produce lower total cost if it reduces rework, line stoppages, and field returns after ramp-up.

**status:** suggested
**Author:** Grace Sun
**Date:** 2026-11-01

## Related Resources

- [Plastic Components Q&A](https://www.hyneu.com/questions/plastic-components/)
- [Plastic Component Manufacturing](https://www.hyneu.com/capabilities/plastic-component-manufacturing/)
- [Plastic Components](https://www.hyneu.com/products/plastic-components/)
- [Plastic Components Buying Guides](https://www.hyneu.com/buying-guides/plastic-components/)
- [Plastic Component Manufacturing Guide](https://www.hyneu.com/guides/plastic-component-manufacturing/)
- [Custom Manufacturing](https://www.hyneu.com/custom-manufacturing/)
- [Industries](https://www.hyneu.com/industries/)
- [Product & Component Design](https://www.hyneu.com/knowledge/product-component-design/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "What Tolerances Are Required for Power Tool Standard Drill Housings?",
        "text": "I manage purchasing for a power tool manufacturer and am currently sourcing injection-molded standard drill housings for a new 750 W corded drill platform. We have 3D and 2D drawings, but our current supplier has repeated problems: boss cracking during screw torque, sink marks near the motor seat, and dimensional drift around the gearbox flange after molding. We need the housing to withstand vibration from a 0–2800 rpm variable-speed drivetrain without audible rattling or screw loosening in life testing. I am trying to compare quotes from several molders, but the unit prices and tooling costs vary widely. Some suppliers quote PA6-GF30, others suggest PC+ABS or PA6+GF15, and they disagree on gate location and draft angles. I need to know what information should be locked before tooling, which tolerances are realistic for critical bearing bores and gearbox mating faces, and what sampling or inspection evidence I should request before approving pilot production. My real concern is balancing upfront tooling cost against long-term rejection risk. What should I require in the quote, tooling plan, and first-article report so I can compare suppliers fairly instead of just choosing the lowest price?",
        "answerCount": 7,
        "upvoteCount": 10,
        "datePublished": "2026-11-01T07:50:56Z",
        "dateModified": "2026-11-01T07:52:53Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "For a 750 W corded drill housing, the first requirement is not a quotation. It is a controlled input pack: frozen 3D and 2D drawings, material specification, surface finish and texture, insert or boss requirements, gasket or mating part data, and the expected load cases. Separate the drawing into cosmetic surfaces, structural areas around the motor and gearbox, and assembly interfaces. This prevents suppliers from quoting against different interpretations. On material, PA6-GF30 is usually the strongest starting point for this application because of rigidity, heat resistance, and better dimensional stability under load. PC+ABS or PA6+GF15 may be acceptable only if the supplier explains what problem they solve. A lower glass content normally reduces stiffness and can increase creep around hot gearbox areas. If two quotes use different materials, unit price comparison is meaningless. Specify the exact grade, heat stabilizer, regrind limit, and any impact modifier before tooling. The most important decision is to freeze the material grade and critical-to-function dimensions before releasing tooling . For injection-molded glass-filled nylon, general dimensions can often be held to ±0.1 mm and larger bosses or housing lengths to ±0.2 mm, but bearing bores and gearbox spigot positions need a separate study. If a bearing seat needs IT7 or tighter, it is usually not reliable to hold directly from the molded hole; plan a secondary boring operation, a steel insert, or a tolerance stack-up exercise. Use GD ask for mold flow analysis at DFM stage. For tooling, require the supplier to state proposed steel and hardness because glass-filled nylon is abrasive. Hardened gate inserts, wear plates at shutoffs, and sufficient venting improve both life and part quality. A hot runner system may reduce regrind and improve cycle time, but it raises tooling cost and maintenance complexity. For a standard housing produced over a long run, that trade-off may still make sense if the supplier quantifies the cycle-time and regrind saving. Cost and lead time must be compared on a normalized quotation . That means same material grade, same cavity count, same steel family, same surface finish, same secondary operations, same tolerances, and same sampling deliverables. A lower unit price often means softer steel, fewer cooling channels, more regrind, or secondary operations excluded. Express total cost as tooling plus expected unit cost over a defined production volume, including sampling, scrap, and any rework allowance. Tooling lead time normally runs from drawing freeze to T1 samples, and any design change after steel cutting adds time and cost, so do not start with uncertain geometry. Before pilot production, require a first-article dimensional report across all cavities, material certificates, shrinkage data, and a 30-shot process capability study for the critical bores, gearbox landing faces, and boss positions. For vibration risk, ask the supplier to assemble test housings with the specified screws and measure torque retention after a vibration or loaded run cycle. If the housing is only measured as two loose halves, you can miss the exact mismatch that causes rattling. Pilot production should run on the same press, same mold, same cycle, and same material lot family that will be used for mass production. Request process parameters, cavity pressure or shot weight limits, and a reaction plan for out-of-control conditions. This is more useful than a perfect sample set produced under laboratory-style conditions. Supplier judgment should consider how the supplier responds to the DFM review. A strong supplier will ask for the gearbox mating component, motor bearing arrangement, and screw torque values, then propose gate location, steel selection, and tolerance splits. A weak supplier will simply quote unit price and say no changes are needed. Check measurement capability, cavity-to-cavity control, mold maintenance plan, and change control before awarding the tool. In decision terms, do not compare quotes from suppliers that have not confirmed the same input basis. Shortlist suppliers by engineering response first, then compare normalized commercial terms. The target is not only a low piece price but a housing that keeps gearbox alignment stable, survives vibration without boss cracking, and can be produced repeatably across cavities.",
            "upvoteCount": 10,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#acceptedAnswer",
            "datePublished": "2026-11-01T08:38:16Z",
            "author": {"@type": "Person","name": "Evan Qian","url": "https://www.hyneu.com/team/evan-qian.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "For a split housing, the real risk is not individual half-shell dimensions but the assembled stack of motor bearing bore, gearbox spigot, and screw boss seating faces. Ask the supplier to measure a small batch of assembled housings against a machined gearbox fixture or a fixed coordinate scheme. If each half shell is only checked to ±0.1 mm with different datums, the combined misalignment can be enough to change gear mesh load and produce vibration. During the pilot build, record screw tightening sequence and clamp gap. Diagonal tightening should close the housing without tilting the gearbox flange. If the gap change across the joint is inconsistent, the problem is usually warpage or boss-to-boss mismatch, not screw torque. This is why first-article inspection should include assembly-level flatness and parallelism, not just loose-part dimensions. A useful acceptance condition is to assemble ten sets with production screws and repeatedly measure gearbox seat alignment. If variation is high even when all individual dimensions pass, the tolerance scheme needs to be changed before mass production. That data protects assembly yield more than a single-part Cpk value.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#suggestedAnswer-2",
            "datePublished": "2026-11-01T08:30:53Z",
            "author": {"@type": "Person","name": "Aaron Fang","url": "https://www.hyneu.com/team/aaron-fang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Before pilot builds, agree on boundary samples and defect classes for glass-filled nylon drill housings. Flow lines and blush on a non-visible internal wall may be acceptable, but sink near a boss root, a weld line through a bearing support, short shots, or exposed glass fibers on a sealing land should be treated as critical. Define critical, major, and minor defects before inspection starts; otherwise the supplier and buyer will argue about cosmetic issues during shipment. Incoming material control should verify resin lot, moisture content, and regrind ratio if the material is dried or blended internally. At the injection process, monitor melt cushion, fill time, holding pressure, and shot weight. At outgoing inspection, combine dimensional checks with assembly fit, screw torque on bosses, and visual limits. Do not rely on final sorting to catch instability; ask the supplier to link defects to process parameters. If boss cracking appears during testing, request a corrective action that identifies the root cause: poor knit line location, excessive regrind, overheating, insufficient packing, or design stress. Containment sorting is not enough. The supplier should show how the process window will be tightened so the defect does not return in the next cavity or batch.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#suggestedAnswer-3",
            "datePublished": "2026-11-01T08:15:29Z",
            "author": {"@type": "Person","name": "Owen Jiang","url": "https://www.hyneu.com/team/owen-jiang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Quotation comparison should be tied to a milestone plan, not just tooling price. Once the drawing is frozen, the sequence should be DFM approval, steel cutting, T1 samples, dimensional report, assembly trial, T2 correction if needed, pilot run, and mass production transfer. Ask each supplier to state the expected duration between those milestones and what they require from the buyer at each gate. This exposes whether a low price includes enough engineering and correction loops. Sample approval should be conditional: a dimensionally good housing that fails screw torque retention or gearbox fit is not approved. The sign-off should reference material certificates, cavity identification, process parameters, and dimensional reports. Any later change to material batch, gate position, steel repair, or process settings should require written risk assessment and a new sample submission. This prevents silent changes during scaling. Production readiness is not the same as sample approval. Before transfer, verify that the tool can run a full pilot on the intended production press, that operators have setup limits, that critical spare parts are defined, and that packaging prevents warpage during transport. A supplier that treats pilot as a formality will create problems after ramp-up.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#suggestedAnswer-4",
            "datePublished": "2026-11-01T08:02:01Z",
            "author": {"@type": "Person","name": "Nathan Guo","url": "https://www.hyneu.com/team/nathan-guo.html"}          }
          ,          {
            "@type": "Answer",
            "text": "Glass-filled nylon is abrasive, so tooling steel choice directly affects long-run dimensional stability. A low quote using soft steel may look acceptable at T1 but will lose shutoff accuracy and develop flash after higher shot counts. Ask suppliers to state steel type, hardness, and expected life in shots for core, cavity, gate inserts, and shutoff areas. This should be part of the normalized comparison. Tooling tolerances must be tighter than part tolerances because glass-filled nylon shrinks non-uniformly. For critical bores and gearbox faces, ask how the mold maker compensates for shrinkage and fiber orientation. Gate location and gate size affect weld line position and boss strength. If the supplier cannot show mold flow results or explain the gate decision, the risk is being hidden inside the tool price. Maintenance should be scheduled before it becomes an emergency. For a high-volume housing tool, spare gate inserts, ejector pins, and wear plates should be available. The quotation should clarify whether insert replacement is included in tool life and how cavity-to-cavity variation will be checked after maintenance. A tool with no spare inserts may force a long production stoppage for a small worn component.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#suggestedAnswer-5",
            "datePublished": "2026-11-01T08:01:16Z",
            "author": {"@type": "Person","name": "Wendy Gao","url": "https://www.hyneu.com/team/wendy-gao.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The housing cannot be validated only on dimensional sheets. It must hold gearbox alignment and screw torque under vibration across the speed range. Ask for a functional conditioning test: assemble the housing with production screws and a dummy gearbox or actual drive train, run at multiple speeds including resonance conditions if known, then recheck torque. A housing that is quiet for the first hour may loosen if the boss compresses or the thread relaxes. Heat is another variable. The motor and gearbox raise local temperature, which softens the boss area over time. In PA6-GF30, moisture conditioning also changes stiffness and thread retention. Therefore, torque retention should be checked after heat soak and after moisture conditioning, not only on dry as-molded housings. This gives a more realistic life indication than a standard tensile test coupon. For end-use fit, the gearbox mating face should be checked under radial load and during screw tightening. The failure to avoid is a small initial step that grows into wear, noise, and crack initiation. A short pilot durability test with a real motor is worth more than a large dimensional sample set without assembly load.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#suggestedAnswer-6",
            "datePublished": "2026-11-01T08:00:01Z",
            "author": {"@type": "Person","name": "Irene Tang","url": "https://www.hyneu.com/team/irene-tang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "One good sample set is not evidence of repeatability. Ask the supplier for a process window study rather than a single process point. Injection speed, melt temperature, mold temperature, packing pressure, and cooling time all affect sink, warpage, boss cracking, and cavity balance. If the supplier is running near the edge of the process window, dimensional results will drift with ordinary batch variation. For a multi-cavity tool, request cavity-by-cavity capability data. If one cavity has lower Cpk, the supplier may simply increase inspection or sort parts, which hides the problem. The better response is to correct runner balance, gate size, or cooling so cavities behave similarly. This reduces total inspection cost and improves assembly consistency. From a continuous improvement view, compare suppliers on how they prevent defects, not how fast they sort them. In-process trend charts, cavity pressure monitoring, and defined reaction limits are stronger evidence than a perfect first article. A slightly higher unit price may produce lower total cost if it reduces rework, line stoppages, and field returns after ramp-up.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/power-tool-standard-drill-housings-tolerances.html#suggestedAnswer-7",
            "datePublished": "2026-11-01T07:52:53Z",
            "author": {"@type": "Person","name": "Grace Sun","url": "https://www.hyneu.com/team/grace-sun.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.hyneu.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.hyneu.com/questions/"},{"@type": "ListItem", "position": 3, "name": "Plastic Components Q&A", "item": "https://www.hyneu.com/questions/plastic-components/"}          ,{"@type": "ListItem", "position": 4, "name": "What Tolerances Are Required for Power Tool Standard Drill Housings?"}
      ]
    }
]
```