# How to Evaluate Nut ODM Manufacturer Quotes and Lead Times?

## Question

 I am an NPI engineer currently driving the trial validation for a customized flange lock nut project before we commit to mass production in 2026. We specified a particular M8 non-standard pitch and a nylon insert feature, but the initial trial run from our ODM supplier has been a nightmare. We received 1,000 pieces for the first trial, and about 15% failed the go/no-go gauge test, plus the positioning of the nylon insert seems slightly off-center. To make matters worse, they are now saying the lead time for the second trial run will take 8 weeks because they need to modify the cold heading dies, and they are increasing the unit cost, claiming they need to source harder tool steel to prevent premature wear. I am under immense pressure from our management to either fix this or find a new partner. How do I evaluate if their updated quote is justified, and whether the revised lead time is a normal tooling adjustment or a sign of deeper capability issues? What specific engineering data or tooling verification should I demand before authorizing the next trial run or looking for an alternative nut ODM manufacturer? 

## Answers
                            
### Answer 1 — Best Answer

To address your immediate NPI bottleneck, the core requirement is to validate whether the ODM supplier can actually control the custom M8 non-standard pitch thread and the nylon insert molding process consistently for mass production in 2026. A 15% failure rate on go/no-go gauges is a severe quality deviation that indicates a systemic tooling or process flaw rather than random variation. Before approving any updated quote or lead time, you must mandate a detailed dimensional capability study of the failed batch. Request the full dimensional report with **CPK values** specifically for the thread pitch diameter, minor diameter, and the insert cavity position. For critical functional threads, a CPK of 1.33 or higher is the baseline expectation. Without this data, proceeding to a second trial run is simply guessing.

From a cost and lead time perspective, replacing or modifying cold heading dies for a non-standard pitch nut is a standard procedure, but an 8-week lead time is highly suspicious unless they are facing an undisclosed capacity constraint or outsourcing the die modification. Normally, manufacturing a new die insert, adjusting the cold heading machine, and running a first article inspection (FAI) takes two to three weeks. If the supplier claims the extended time is due to upgrading the die insert material to a harder tool steel, like powder metallurgy high-speed steel (PM-HSS), to withstand the non-standard pitch forming forces, a slight unit cost increase might be justifiable. However, the quote must be accompanied by an Engineering Change Order (ECO) and a cost breakdown. You need to verify if the cost increase is driven by the raw material of the die insert or if they are simply passing on the rework costs of their initial tooling mistake. Ask for the expected tool life projection to justify the unit price increase. If they cannot prove the material upgrade, the pricing is unjustified.

In terms of supplier judgment, this situation presents a significant red flag regarding their tooling engineering capability. A customized flange lock nut with a nylon insert requires precise multi-station cold heading followed by a secondary tapping or insert molding operation. The off-center positioning of the nylon insert suggests that their die alignment is flawed or the blanking process is unstable. Before authorizing the next trial run, you should request a virtual or on-site process audit of their cold heading and insert molding stations. Check their gauge calibration records—specifically for the custom M8 non-standard pitch go/no-go gauges. If the gauges themselves are worn or uncalibrated, the 15% failure rate might be a measurement error rather than a physical part defect.

Before submitting the revised drawings or authorizing the second run, require the supplier to perform a **50 to 100 piece engineering validation run**. This minimizes your risk in both time and material costs. It allows you to verify if the tooling modifications actually resolved the tolerance issue before committing to the full 1,000-piece trial. Do not accept a full batch run without a preliminary FAI approval.

Simultaneously, initiate the process of evaluating alternative nut ODM manufacturers immediately. Send your technical drawings and specifications to one or two backup suppliers. Focus on those with proven multi-station cold heading capabilities and in-house tooling maintenance. Compare their tooling NRE (Non-Recurring Engineering) costs, MOQ requirements, and initial lead time quotes. Having a parallel quote benchmark and a secondary engineering opinion will provide the necessary leverage in your negotiations and ensure you have a viable backup if the second trial fails.

Finally, ensure that expectations are formally aligned through a strict quality plan. Establish clear incoming quality control (IQC) criteria for the second trial, defining exactly what constitutes a pass or fail for the thread gauge test, insert pull-out force, and flange face flatness. If more than 2% of the next batch fails the gauge test, the project should pause immediately. This strict threshold will protect your NPI timeline and force the supplier to take the tooling modification seriously. By combining technical validation with strict purchasing milestones, you can determine if the supplier's updated quote is engineering-driven or simply a reflection of poor manufacturing capability.

**status:** accepted
**Author:** Leo Shen
**Date:** 2026-10-26

### Answer 2

Before proceeding with the second trial run, the material compliance documentation for the customized nuts must be thoroughly reviewed.

For the nylon insert, you must request a material data sheet to verify that the polymer complies with RoHS and REACH regulations, especially if the 2026 mass production units are destined for the European or North American markets. Often, suppliers use generic nylon grades that may fail under thermal stress if not explicitly specified.

Equally critical is the compliance of the thread gauge calibration. Since this is a non-standard M8 pitch, standard go/no-go gauges will not suffice; they must be custom-manufactured and certified.

You need to verify that the custom gauges used to reject the 15% of the batch were calibrated against a recognized standard. Request the calibration certificates for the gauges.

If the supplier tested the initial batch with uncertified gauges, the failure rate might be a measurement error rather than a physical dimensional defect. Ensure all testing protocols are documented and signed off before the next production round.

**status:** suggested
**Author:** Wendy Gao
**Date:** 2026-10-26

### Answer 3

To unblock your trial validation without waiting for the 8-week die modification, consider separating the engineering validation from the production validation. Have a local machining shop produce 50 pieces of the nut using CNC turning and milling.

While CNC machined parts will not reflect the cold heading mechanical properties, they will allow your R&D team to immediately validate the non-standard pitch fit and the functional position of the nylon insert.

This parallel approach allows you to test the torque and pull-out force in the actual application while assessing the ODM manufacturer's tooling fix. If the machined prototypes fail the torque test, you have a design flaw, saving you weeks of waiting for faulty tooling.

If they pass, you have a solid functional baseline to present to the supplier, ensuring they understand exactly what dimensional target they need to hit with the revised cold heading dies.

**status:** suggested
**Author:** Marcus He
**Date:** 2026-10-26

### Answer 4

The off-center positioning issue of the nylon insert might not solely be a result of the cold heading or insert molding process. The handling and packaging of the trial batch can significantly induce perceived defects.

Shipping 1,000 customized flange lock nuts in bulk bags creates friction and impact during transit, which can easily deform the nylon inserts or shift them within the flange cavity, leading to gauge failures during your incoming inspection.

When evaluating the supplier's updated quote, check if they have included the cost of proper protective packaging. For trial production and early mass production, it is advisable to request that the supplier uses layer-packed trays with individual compartments.

This adds a minor cost per unit but eliminates the transit damage variable. Ensure you inspect the parts for impact marks before running the gauge tests, so you are not penalizing the supplier for logistics-related damage.

**status:** suggested
**Author:** Victor Luo
**Date:** 2026-10-26

### Answer 5

When evaluating the suitability of the supplier, the functional interaction between the non-standard M8 pitch and the nylon insert must be scrutinized. The application environment dictates whether the tolerance stack-up is truly acceptable.

If these nuts are destined for high-vibration assemblies, the slight interference fit of the non-standard pitch might be intentional, but the nylon insert must be perfectly seated to provide the necessary prevailing torque. The 15% gauge failure rate could be because the thread is too tight due to the insert pushing the threads outward.

Before approving the quote or second trial run, ask the supplier to provide torque-tension test data. They should be able to demonstrate that the nut can be threaded onto a mating bolt and unthreaded multiple times without stripping or losing its locking force.

If they cannot provide this application-level testing data, you are facing a tooling issue as well as an engineering validation gap. Ensure your purchasing decision factors in whether the supplier understands the functional requirements, not just the dimensional drawings.

**status:** suggested
**Author:** Henry Cao
**Date:** 2026-10-26

### Answer 6

The 8-week lead time and 15% failure rate are strong indicators of inadequate internal tooling maintenance capabilities at the supplier's facility. It is essential to assess their tooling infrastructure before committing to the second trial.

Ask if they have an in-house tooling room or if they outsource die modifications to a third party. A factory with in-house tooling maintenance can typically turn around a die insert replacement in under a week. If they outsource, the 8-week lead time reflects a third party's schedule, not proactive project management.

You should also audit their equipment maintenance schedules and spare parts inventory. A capable ODM manufacturer for custom hardware should maintain spare die inserts for critical tooling, especially for non-standard profiles like your M8 pitch.

If they do not have spares, your 2026 mass production will face significant supply disruption risks. Ask for their machine maintenance logs and tooling inventory list to determine if they are a strategic manufacturing partner or merely a reactive assembler.

**status:** suggested
**Author:** Owen Jiang
**Date:** 2026-10-26

### Answer 7

When analyzing the updated quote, dissect the tooling amortization logic the supplier is using. Custom cold heading dies, especially those with non-standard pitch profiles, have a finite lifespan.

If the supplier is increasing the unit cost to offset tooling wear, they are essentially passing their manufacturing inefficiencies directly onto your product. Standard practice dictates that primary tooling costs should be amortized as a non-recurring engineering (NRE) fee upfront, while only standard consumable die maintenance is factored into the piece price.

To judge the fairness of the pricing, request a clear breakdown of the die insert material cost versus the labor and machine time required for the modification. If they are using standard tool steel, the price increase is likely unjustified.

Calculate the total cost of ownership for the tooling setup and evaluate if their MOQ requirements genuinely justify the increased per-unit cost or if they are using the low MOQ as leverage to pass on poor process yields. Benchmark these figures with an alternative supplier's quote before committing.

**status:** suggested
**Author:** Irene Tang
**Date:** 2026-10-26

### Answer 8

The 15% failure rate on go/no-go gauges demands a strict root cause analysis (RCA) classification before moving forward. Not all thread failures are equal.

You need to request a detailed breakdown of the 15% defective batch. Determine if the thread failures were due to the pitch diameter being too large, burrs being pushed into the thread root during cold heading, or material flow issues during the forming process.

If burrs are the culprit, the solution is a simple adjustment to the punch clearance, which is fast and inexpensive. If it is a material flow issue, the die might need a complete redesign.

Establish an incoming quality control (IQC) protocol that clearly classifies these defects for the next run. Require the supplier to implement 100% optical sorting after the insert molding station and before the final threading operation.

If the supplier resists implementing 100% sorting without a concrete defect map, that is a severe quality culture red flag. Quality decisions must be driven by data, not by subjective supplier assurances.

**status:** suggested
**Author:** Aaron Fang
**Date:** 2026-10-26

## Related Resources

- [Custom Manufacturing Q&A](https://www.hyneu.com/questions/custom-manufacturing/)
- [Custom Manufacturing](https://www.hyneu.com/custom-manufacturing/)
- [OEM Manufacturing](https://www.hyneu.com/custom-manufacturing/oem/)
- [ODM Manufacturing](https://www.hyneu.com/custom-manufacturing/odm/)
- [Contract Manufacturing](https://www.hyneu.com/custom-manufacturing/contract/)
- [Capabilities](https://www.hyneu.com/capabilities/)
- [Products](https://www.hyneu.com/products/)
- [Buying Guides](https://www.hyneu.com/buying-guides/)

## Structured Data

```json
[
    {
      "@context": "https://schema.org",
      "@type": "QAPage",
      "mainEntity": {
        "@type": "Question",
        "name": "How to Evaluate Nut ODM Manufacturer Quotes and Lead Times?",
        "text": "I am an NPI engineer currently driving the trial validation for a customized flange lock nut project before we commit to mass production in 2026. We specified a particular M8 non-standard pitch and a nylon insert feature, but the initial trial run from our ODM supplier has been a nightmare. We received 1,000 pieces for the first trial, and about 15% failed the go/no-go gauge test, plus the positioning of the nylon insert seems slightly off-center. To make matters worse, they are now saying the lead time for the second trial run will take 8 weeks because they need to modify the cold heading dies, and they are increasing the unit cost, claiming they need to source harder tool steel to prevent premature wear. I am under immense pressure from our management to either fix this or find a new partner. How do I evaluate if their updated quote is justified, and whether the revised lead time is a normal tooling adjustment or a sign of deeper capability issues? What specific engineering data or tooling verification should I demand before authorizing the next trial run or looking for an alternative nut ODM manufacturer?",
        "answerCount": 8,
        "upvoteCount": 9,
        "datePublished": "2026-10-26T19:45:55Z",
        "dateModified": "2026-10-26T19:55:54Z",
        "author": {
          "@type": "Person",
          "name": "Anonymous",
          "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html"
        }
                ,"acceptedAnswer": {
            "@type": "Answer",
            "text": "To address your immediate NPI bottleneck, the core requirement is to validate whether the ODM supplier can actually control the custom M8 non-standard pitch thread and the nylon insert molding process consistently for mass production in 2026. A 15% failure rate on go/no-go gauges is a severe quality deviation that indicates a systemic tooling or process flaw rather than random variation. Before approving any updated quote or lead time, you must mandate a detailed dimensional capability study of the failed batch. Request the full dimensional report with CPK values specifically for the thread pitch diameter, minor diameter, and the insert cavity position. For critical functional threads, a CPK of 1.33 or higher is the baseline expectation. Without this data, proceeding to a second trial run is simply guessing. From a cost and lead time perspective, replacing or modifying cold heading dies for a non-standard pitch nut is a standard procedure, but an 8-week lead time is highly suspicious unless they are facing an undisclosed capacity constraint or outsourcing the die modification. Normally, manufacturing a new die insert, adjusting the cold heading machine, and running a first article inspection (FAI) takes two to three weeks. If the supplier claims the extended time is due to upgrading the die insert material to a harder tool steel, like powder metallurgy high-speed steel (PM-HSS), to withstand the non-standard pitch forming forces, a slight unit cost increase might be justifiable. However, the quote must be accompanied by an Engineering Change Order (ECO) and a cost breakdown. You need to verify if the cost increase is driven by the raw material of the die insert or if they are simply passing on the rework costs of their initial tooling mistake. Ask for the expected tool life projection to justify the unit price increase. If they cannot prove the material upgrade, the pricing is unjustified. In terms of supplier judgment, this situation presents a significant red flag regarding their tooling engineering capability. A customized flange lock nut with a nylon insert requires precise multi-station cold heading followed by a secondary tapping or insert molding operation. The off-center positioning of the nylon insert suggests that their die alignment is flawed or the blanking process is unstable. Before authorizing the next trial run, you should request a virtual or on-site process audit of their cold heading and insert molding stations. Check their gauge calibration records—specifically for the custom M8 non-standard pitch go/no-go gauges. If the gauges themselves are worn or uncalibrated, the 15% failure rate might be a measurement error rather than a physical part defect. Before submitting the revised drawings or authorizing the second run, require the supplier to perform a 50 to 100 piece engineering validation run . This minimizes your risk in both time and material costs. It allows you to verify if the tooling modifications actually resolved the tolerance issue before committing to the full 1,000-piece trial. Do not accept a full batch run without a preliminary FAI approval. Simultaneously, initiate the process of evaluating alternative nut ODM manufacturers immediately. Send your technical drawings and specifications to one or two backup suppliers. Focus on those with proven multi-station cold heading capabilities and in-house tooling maintenance. Compare their tooling NRE (Non-Recurring Engineering) costs, MOQ requirements, and initial lead time quotes. Having a parallel quote benchmark and a secondary engineering opinion will provide the necessary leverage in your negotiations and ensure you have a viable backup if the second trial fails. Finally, ensure that expectations are formally aligned through a strict quality plan. Establish clear incoming quality control (IQC) criteria for the second trial, defining exactly what constitutes a pass or fail for the thread gauge test, insert pull-out force, and flange face flatness. If more than 2% of the next batch fails the gauge test, the project should pause immediately. This strict threshold will protect your NPI timeline and force the supplier to take the tooling modification seriously. By combining technical validation with strict purchasing milestones, you can determine if the supplier&#039;s updated quote is engineering-driven or simply a reflection of poor manufacturing capability.",
            "upvoteCount": 9,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#acceptedAnswer",
            "datePublished": "2026-10-26T20:36:06Z",
            "author": {"@type": "Person","name": "Leo Shen","url": "https://www.hyneu.com/team/leo-shen.html"}        }
                ,"suggestedAnswer": [
                  {
            "@type": "Answer",
            "text": "Before proceeding with the second trial run, the material compliance documentation for the customized nuts must be thoroughly reviewed. For the nylon insert, you must request a material data sheet to verify that the polymer complies with RoHS and REACH regulations, especially if the 2026 mass production units are destined for the European or North American markets. Often, suppliers use generic nylon grades that may fail under thermal stress if not explicitly specified. Equally critical is the compliance of the thread gauge calibration. Since this is a non-standard M8 pitch, standard go/no-go gauges will not suffice; they must be custom-manufactured and certified. You need to verify that the custom gauges used to reject the 15% of the batch were calibrated against a recognized standard. Request the calibration certificates for the gauges. If the supplier tested the initial batch with uncertified gauges, the failure rate might be a measurement error rather than a physical dimensional defect. Ensure all testing protocols are documented and signed off before the next production round.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-2",
            "datePublished": "2026-10-26T20:31:35Z",
            "author": {"@type": "Person","name": "Wendy Gao","url": "https://www.hyneu.com/team/wendy-gao.html"}          }
          ,          {
            "@type": "Answer",
            "text": "To unblock your trial validation without waiting for the 8-week die modification, consider separating the engineering validation from the production validation. Have a local machining shop produce 50 pieces of the nut using CNC turning and milling. While CNC machined parts will not reflect the cold heading mechanical properties, they will allow your R&amp;D team to immediately validate the non-standard pitch fit and the functional position of the nylon insert. This parallel approach allows you to test the torque and pull-out force in the actual application while assessing the ODM manufacturer&#039;s tooling fix. If the machined prototypes fail the torque test, you have a design flaw, saving you weeks of waiting for faulty tooling. If they pass, you have a solid functional baseline to present to the supplier, ensuring they understand exactly what dimensional target they need to hit with the revised cold heading dies.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-3",
            "datePublished": "2026-10-26T20:21:09Z",
            "author": {"@type": "Person","name": "Marcus He","url": "https://www.hyneu.com/team/marcus-he.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The off-center positioning issue of the nylon insert might not solely be a result of the cold heading or insert molding process. The handling and packaging of the trial batch can significantly induce perceived defects. Shipping 1,000 customized flange lock nuts in bulk bags creates friction and impact during transit, which can easily deform the nylon inserts or shift them within the flange cavity, leading to gauge failures during your incoming inspection. When evaluating the supplier&#039;s updated quote, check if they have included the cost of proper protective packaging. For trial production and early mass production, it is advisable to request that the supplier uses layer-packed trays with individual compartments. This adds a minor cost per unit but eliminates the transit damage variable. Ensure you inspect the parts for impact marks before running the gauge tests, so you are not penalizing the supplier for logistics-related damage.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-4",
            "datePublished": "2026-10-26T20:14:16Z",
            "author": {"@type": "Person","name": "Victor Luo","url": "https://www.hyneu.com/team/victor-luo.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When evaluating the suitability of the supplier, the functional interaction between the non-standard M8 pitch and the nylon insert must be scrutinized. The application environment dictates whether the tolerance stack-up is truly acceptable. If these nuts are destined for high-vibration assemblies, the slight interference fit of the non-standard pitch might be intentional, but the nylon insert must be perfectly seated to provide the necessary prevailing torque. The 15% gauge failure rate could be because the thread is too tight due to the insert pushing the threads outward. Before approving the quote or second trial run, ask the supplier to provide torque-tension test data. They should be able to demonstrate that the nut can be threaded onto a mating bolt and unthreaded multiple times without stripping or losing its locking force. If they cannot provide this application-level testing data, you are facing a tooling issue as well as an engineering validation gap. Ensure your purchasing decision factors in whether the supplier understands the functional requirements, not just the dimensional drawings.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-5",
            "datePublished": "2026-10-26T20:11:25Z",
            "author": {"@type": "Person","name": "Henry Cao","url": "https://www.hyneu.com/team/henry-cao.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The 8-week lead time and 15% failure rate are strong indicators of inadequate internal tooling maintenance capabilities at the supplier&#039;s facility. It is essential to assess their tooling infrastructure before committing to the second trial. Ask if they have an in-house tooling room or if they outsource die modifications to a third party. A factory with in-house tooling maintenance can typically turn around a die insert replacement in under a week. If they outsource, the 8-week lead time reflects a third party&#039;s schedule, not proactive project management. You should also audit their equipment maintenance schedules and spare parts inventory. A capable ODM manufacturer for custom hardware should maintain spare die inserts for critical tooling, especially for non-standard profiles like your M8 pitch. If they do not have spares, your 2026 mass production will face significant supply disruption risks. Ask for their machine maintenance logs and tooling inventory list to determine if they are a strategic manufacturing partner or merely a reactive assembler.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-6",
            "datePublished": "2026-10-26T19:58:54Z",
            "author": {"@type": "Person","name": "Owen Jiang","url": "https://www.hyneu.com/team/owen-jiang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "When analyzing the updated quote, dissect the tooling amortization logic the supplier is using. Custom cold heading dies, especially those with non-standard pitch profiles, have a finite lifespan. If the supplier is increasing the unit cost to offset tooling wear, they are essentially passing their manufacturing inefficiencies directly onto your product. Standard practice dictates that primary tooling costs should be amortized as a non-recurring engineering (NRE) fee upfront, while only standard consumable die maintenance is factored into the piece price. To judge the fairness of the pricing, request a clear breakdown of the die insert material cost versus the labor and machine time required for the modification. If they are using standard tool steel, the price increase is likely unjustified. Calculate the total cost of ownership for the tooling setup and evaluate if their MOQ requirements genuinely justify the increased per-unit cost or if they are using the low MOQ as leverage to pass on poor process yields. Benchmark these figures with an alternative supplier&#039;s quote before committing.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-7",
            "datePublished": "2026-10-26T19:58:16Z",
            "author": {"@type": "Person","name": "Irene Tang","url": "https://www.hyneu.com/team/irene-tang.html"}          }
          ,          {
            "@type": "Answer",
            "text": "The 15% failure rate on go/no-go gauges demands a strict root cause analysis (RCA) classification before moving forward. Not all thread failures are equal. You need to request a detailed breakdown of the 15% defective batch. Determine if the thread failures were due to the pitch diameter being too large, burrs being pushed into the thread root during cold heading, or material flow issues during the forming process. If burrs are the culprit, the solution is a simple adjustment to the punch clearance, which is fast and inexpensive. If it is a material flow issue, the die might need a complete redesign. Establish an incoming quality control (IQC) protocol that clearly classifies these defects for the next run. Require the supplier to implement 100% optical sorting after the insert molding station and before the final threading operation. If the supplier resists implementing 100% sorting without a concrete defect map, that is a severe quality culture red flag. Quality decisions must be driven by data, not by subjective supplier assurances.",
            "upvoteCount": 0,
            "url": "https://www.hyneu.com/questions/evaluate-nut-odm-manufacturer-quotes-lead-times.html#suggestedAnswer-8",
            "datePublished": "2026-10-26T19:55:54Z",
            "author": {"@type": "Person","name": "Aaron Fang","url": "https://www.hyneu.com/team/aaron-fang.html"}          }
                  ]
              }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
          {"@type": "ListItem", "position": 1, "name": "Home", "item": "https://www.hyneu.com/"},{"@type": "ListItem", "position": 2, "name": "Q&A", "item": "https://www.hyneu.com/questions/"},{"@type": "ListItem", "position": 3, "name": "Custom Manufacturing Q&A", "item": "https://www.hyneu.com/questions/custom-manufacturing/"}          ,{"@type": "ListItem", "position": 4, "name": "How to Evaluate Nut ODM Manufacturer Quotes and Lead Times?"}
      ]
    }
]
```